After gsd-plan-phase 1: 7 plans across 7 waves. All gates pass: - Plan-checker (sonnet) VERIFICATION PASSED on iteration 1 - Decision coverage gate (gsd-sdk): 19/19 decisions covered - Requirements coverage: REQ-video-ring-buffer in all plans - Security threat model: T-1-01/02/04 mitigated; T-1-03 accepted residual Known non-blocking gaps: - gsd-sdk roadmap.annotate-dependencies failed (t.trim is not a function); ROADMAP plan-list annotations skipped. Phase 1 plan-list in ROADMAP.md remains accurate; this is a cosmetic nice-to-have for cross-cutting constraint visibility. - 1 plan-checker warning (stale wave prose in Plan 03/04 objectives) was fixed during decision-coverage revision. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
105 lines
2.9 KiB
Markdown
105 lines
2.9 KiB
Markdown
---
|
||
gsd_state_version: 1.0
|
||
milestone: v2.0.0
|
||
milestone_name: milestone
|
||
status: executing
|
||
stopped_at: Phase 1 context gathered
|
||
last_updated: "2026-05-15T15:08:45.135Z"
|
||
last_activity: 2026-05-15 -- Phase 1 planning complete
|
||
progress:
|
||
total_phases: 5
|
||
completed_phases: 0
|
||
total_plans: 7
|
||
completed_plans: 0
|
||
percent: 0
|
||
---
|
||
|
||
# Project State
|
||
|
||
## Project Reference
|
||
|
||
See: .planning/PROJECT.md (updated 2026-05-15)
|
||
|
||
**Core value:** When an operator hits a bug, one click MUST produce a
|
||
self-contained archive that lets support reproduce what happened — in under 5 s,
|
||
no server, no password leaks.
|
||
**Current focus:** Phase 1 — Stabilize video pipeline
|
||
|
||
## Current Position
|
||
|
||
Phase: 1 of 5 (Stabilize video pipeline)
|
||
Plan: 0 of TBD in current phase
|
||
Status: Ready to execute
|
||
Last activity: 2026-05-15 -- Phase 1 planning complete
|
||
REQUIREMENTS.md, ROADMAP.md, STATE.md written)
|
||
|
||
Progress: [░░░░░░░░░░] 0%
|
||
|
||
## Performance Metrics
|
||
|
||
**Velocity:**
|
||
|
||
- Total plans completed: 0
|
||
- Average duration: —
|
||
- Total execution time: —
|
||
|
||
**By Phase:**
|
||
|
||
| Phase | Plans | Total | Avg/Plan |
|
||
|-------|-------|-------|----------|
|
||
| 1. Stabilize video pipeline | 0 | — | — |
|
||
| 2. Stabilize DOM + event capture privacy | 0 | — | — |
|
||
| 3. Stabilize export pipeline | 0 | — | — |
|
||
| 4. SPEC §10 smoke verification | 0 | — | — |
|
||
| 5. Harden + clean up | 0 | — | — |
|
||
|
||
**Recent Trend:**
|
||
|
||
- Last 5 plans: —
|
||
- Trend: —
|
||
|
||
*Updated after each plan completion*
|
||
|
||
## Accumulated Context
|
||
|
||
### Decisions
|
||
|
||
Decisions are logged in PROJECT.md Key Decisions table (DEC-001 through
|
||
DEC-012, all SPEC-Accepted and locked for Phase 1). Recent decisions affecting
|
||
current work:
|
||
|
||
- Phase 1 framing: roadmap treats the existing codebase as a partially-broken
|
||
first attempt to be remediated against the SPEC, not as greenfield. The
|
||
7 P0 defects from the audit are split across phases 1–3 along commit
|
||
boundaries; phase 4 is end-to-end SPEC §10 smoke verification.
|
||
|
||
- All 12 SPEC decisions (`DEC-001`..`DEC-012`) are LOCKED for Phase 1.
|
||
Changing any of them requires a formal ADR; none are formally LOCKED in the
|
||
ingest classification, so a future ADR can revise.
|
||
|
||
### Pending Todos
|
||
|
||
None yet.
|
||
|
||
### Blockers/Concerns
|
||
|
||
- (informational) `chrome.tabCapture` requires a user gesture on first
|
||
activation — Phase 3 (P0-4) restores this by moving the call into the popup
|
||
click handler; until Phase 3 lands, recording cannot start cleanly even if
|
||
Phase 1's pipeline is correct. Phases 1–3 should not be re-ordered.
|
||
|
||
## Deferred Items
|
||
|
||
Items acknowledged and carried forward from previous milestone close:
|
||
|
||
| Category | Item | Status | Deferred At |
|
||
|----------|------|--------|-------------|
|
||
| *(none)* | | | |
|
||
|
||
## Session Continuity
|
||
|
||
Last session: 2026-05-15T13:40:45.462Z
|
||
Stopped at: Phase 1 context gathered
|
||
intel synthesis. Coverage validated: 11/11 v1 REQs mapped.
|
||
Resume file: .planning/phases/01-stabilize-video-pipeline/01-CONTEXT.md
|