Plan 01-01 (Wave-0 doc cascade) complete. Six tasks landed atomically in commits125c032,fb88830,b1ed2cb,597d967,32bc996,4a5194e. Every code-touching plan in Phase 1 (01-02..01-07) now reads a consistent baseline: getDisplayMedia replaces tabCapture in DEC-003; long-lived port replaces alarms in DEC-010; manifest.json carries the final Phase-1 permissions set (desktopCapture, activeTab, downloads, scripting, storage, offscreen). SUMMARY: .planning/phases/01-stabilize-video-pipeline/01-01-SUMMARY.md
3.3 KiB
gsd_state_version, milestone, milestone_name, status, stopped_at, last_updated, last_activity, progress
| gsd_state_version | milestone | milestone_name | status | stopped_at | last_updated | last_activity | progress | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.0 | v2.0.0 | milestone | executing | Completed 01-01 doc cascade — Plan 01-02 next | 2026-05-15T15:19:25.904Z | 2026-05-15 |
|
Project State
Project Reference
See: .planning/PROJECT.md (updated 2026-05-15)
Core value: When an operator hits a bug, one click MUST produce a self-contained archive that lets support reproduce what happened — in under 5 s, no server, no password leaks. Current focus: Phase 1 — Stabilize Video Pipeline
Current Position
Phase: 1 (Stabilize Video Pipeline) — EXECUTING Plan: 2 of 7 Status: Ready to execute Last activity: 2026-05-15 REQUIREMENTS.md, ROADMAP.md, STATE.md written)
Progress: [█░░░░░░░░░] 14%
Performance Metrics
Velocity:
- Total plans completed: 0
- Average duration: —
- Total execution time: —
By Phase:
| Phase | Plans | Total | Avg/Plan |
|---|---|---|---|
| 1. Stabilize video pipeline | 0 | — | — |
| 2. Stabilize DOM + event capture privacy | 0 | — | — |
| 3. Stabilize export pipeline | 0 | — | — |
| 4. SPEC §10 smoke verification | 0 | — | — |
| 5. Harden + clean up | 0 | — | — |
Recent Trend:
- Last 5 plans: —
- Trend: —
Updated after each plan completion | Phase 01 P01 | 4min | 6 tasks | 6 files |
Accumulated Context
Decisions
Decisions are logged in PROJECT.md Key Decisions table (DEC-001 through DEC-012, all SPEC-Accepted and locked for Phase 1). Recent decisions affecting current work:
-
Phase 1 framing: roadmap treats the existing codebase as a partially-broken first attempt to be remediated against the SPEC, not as greenfield. The 7 P0 defects from the audit are split across phases 1–3 along commit boundaries; phase 4 is end-to-end SPEC §10 smoke verification.
-
All 12 SPEC decisions (
DEC-001..DEC-012) are LOCKED for Phase 1. Changing any of them requires a formal ADR; none are formally LOCKED in the ingest classification, so a future ADR can revise. -
[Phase ?]: Doc cascade: amendments append (do not replace) original DEC/CON blocks to preserve SPEC provenance — Established convention for future SPEC-amending phases; downstream readers see both old + new with citation
-
[Phase ?]: Manifest: drop alarms permission entirely rather than retain for re-use — Plan 05 deletes the alarms code path; declaring unused permissions expands attack surface (T-1-02)
Pending Todos
None yet.
Blockers/Concerns
- (informational)
chrome.tabCapturerequires a user gesture on first activation — Phase 3 (P0-4) restores this by moving the call into the popup click handler; until Phase 3 lands, recording cannot start cleanly even if Phase 1's pipeline is correct. Phases 1–3 should not be re-ordered.
Deferred Items
Items acknowledged and carried forward from previous milestone close:
| Category | Item | Status | Deferred At |
|---|---|---|---|
| (none) |
Session Continuity
Last session: 2026-05-15T15:19:25.886Z Stopped at: Completed 01-01 doc cascade — Plan 01-02 next intel synthesis. Coverage validated: 11/11 v1 REQs mapped. Resume file: .planning/phases/01-stabilize-video-pipeline/01-02-PLAN.md