Files
mokosh/.planning/STATE.md
Mark edc605d475 docs(01-02): complete wave-0 test infrastructure plan
- 01-02-SUMMARY.md created (Vitest 4.1.6 installed; 4 RED test files
  pinning Plans 03+04 contracts; tests/fixtures/.gitkeep marker)
- STATE.md advanced: plan 2/7 -> 3/7; progress 14% -> 29%; metric row
  added; 3 decisions logged; session continuity updated
- ROADMAP.md progress row updated: Phase 1 = 2/7 In Progress
- REQUIREMENTS.md: REVERTED premature [x] + "Complete" marking of
  REQ-video-ring-buffer (Plan 01-01 mistakenly marked it; the requirement
  is satisfied by Plans 03+04+07's implementation + ffprobe gate, not by
  RED test scaffolding). Now reads "[ ]" + "In Progress" — honest state.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-15 17:28:49 +02:00

113 lines
3.8 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
---
gsd_state_version: 1.0
milestone: v2.0.0
milestone_name: milestone
status: executing
stopped_at: Plan 01-03 next (offscreen recorder TDD — flip ring-buffer + codec-check RED -> GREEN)
last_updated: "2026-05-15T15:28:03.545Z"
last_activity: 2026-05-15
progress:
total_phases: 5
completed_phases: 0
total_plans: 7
completed_plans: 2
percent: 29
---
# Project State
## Project Reference
See: .planning/PROJECT.md (updated 2026-05-15)
**Core value:** When an operator hits a bug, one click MUST produce a
self-contained archive that lets support reproduce what happened — in under 5 s,
no server, no password leaks.
**Current focus:** Phase 1 — Stabilize Video Pipeline
## Current Position
Phase: 1 (Stabilize Video Pipeline) — EXECUTING
Plan: 3 of 7
Status: Ready to execute
Last activity: 2026-05-15
REQUIREMENTS.md, ROADMAP.md, STATE.md written)
Progress: [███░░░░░░░] 29%
## Performance Metrics
**Velocity:**
- Total plans completed: 0
- Average duration: —
- Total execution time: —
**By Phase:**
| Phase | Plans | Total | Avg/Plan |
|-------|-------|-------|----------|
| 1. Stabilize video pipeline | 0 | — | — |
| 2. Stabilize DOM + event capture privacy | 0 | — | — |
| 3. Stabilize export pipeline | 0 | — | — |
| 4. SPEC §10 smoke verification | 0 | — | — |
| 5. Harden + clean up | 0 | — | — |
**Recent Trend:**
- Last 5 plans: —
- Trend: —
*Updated after each plan completion*
| Phase 01 P01 | 4min | 6 tasks | 6 files |
| Phase 01 P02 | 4min | 5 tasks | 8 files |
## Accumulated Context
### Decisions
Decisions are logged in PROJECT.md Key Decisions table (DEC-001 through
DEC-012, all SPEC-Accepted and locked for Phase 1). Recent decisions affecting
current work:
- Phase 1 framing: roadmap treats the existing codebase as a partially-broken
first attempt to be remediated against the SPEC, not as greenfield. The
7 P0 defects from the audit are split across phases 13 along commit
boundaries; phase 4 is end-to-end SPEC §10 smoke verification.
- All 12 SPEC decisions (`DEC-001`..`DEC-012`) are LOCKED for Phase 1.
Changing any of them requires a formal ADR; none are formally LOCKED in the
ingest classification, so a future ADR can revise.
- [Phase ?]: Doc cascade: amendments append (do not replace) original DEC/CON blocks to preserve SPEC provenance — Established convention for future SPEC-amending phases; downstream readers see both old + new with citation
- [Phase ?]: Manifest: drop alarms permission entirely rather than retain for re-use — Plan 05 deletes the alarms code path; declaring unused permissions expands attack surface (T-1-02)
- [Phase ?]: Pinned vitest at ^4 (4.1.6 latest stable; 5.x still beta on 2026-05-15)
- [Phase ?]: Phase 1 Wave-0 test infra: 4 RED tests committed against not-yet-existent src/offscreen/recorder.ts — pins contracts for Plans 03+04
- [Phase ?]: Reverted premature REQ-video-ring-buffer Complete marking left by Plan 01-01; satisfied by Plans 03+04+07, not by Wave-0 RED tests
### Pending Todos
None yet.
### Blockers/Concerns
- (informational) `chrome.tabCapture` requires a user gesture on first
activation — Phase 3 (P0-4) restores this by moving the call into the popup
click handler; until Phase 3 lands, recording cannot start cleanly even if
Phase 1's pipeline is correct. Phases 13 should not be re-ordered.
## Deferred Items
Items acknowledged and carried forward from previous milestone close:
| Category | Item | Status | Deferred At |
|----------|------|--------|-------------|
| *(none)* | | | |
## Session Continuity
Last session: 2026-05-15T15:27:57.027Z
Stopped at: Plan 01-03 next (offscreen recorder TDD — flip ring-buffer + codec-check RED -> GREEN)
intel synthesis. Coverage validated: 11/11 v1 REQs mapped.
Resume file: .planning/phases/01-stabilize-video-pipeline/01-03-PLAN.md