Files
mokosh/.planning/phases/04-harden-clean-up-optional/.continue-here.md

9.1 KiB

context, phase, plan_count, status, last_updated
context phase plan_count status last_updated
phase 04-harden-clean-up-optional 7 paused 2026-05-21T08:22:59.958Z

BLOCKING CONSTRAINTS — None

No blocking constraints introduced this session. Three advisory anti-patterns logged below (do not gate resumption).

Critical Anti-Patterns

Pattern Description Severity Prevention Mechanism
state.record-session CLI bug — recurring gsd-sdk query state.record-session flips STATE.md status to completed when total_plans/completed_plans ratio triggers it. Recurred at 8+ state.record-session calls this session. advisory NEXT-SESSION: manually fix STATE.md status field after every state.record-session call. Upstream GSD framework concern; not Mokosh-side.
/gsd-plan-phase UI gate auto-exits on manual invocation Manual /gsd-plan-phase cannot nested-Skill-spawn /gsd-ui-phase due to AskUserQuestion-in-subcontext issue #1009. Workflow correctly exits + tells user to run /gsd-ui-phase separately. advisory Pattern used twice this session (Phase 3 + Phase 4); preserve gate answers in .plan-phase-preferences.md (auto-deleted on next plan-phase consumption). Standard pattern; not a defect.
Plan-checker line-range disjointness check missing Plan-checker only validates file-level overlap; doesn't check line-range disjointness for potential parallelization wins. advisory NEXT-SESSION: when reviewing wave structure, manually check line-range disjointness if files_modified overlap is present.

Current State

Phase 4 (Harden + clean up — optional) PLANNING COMPLETE. Ready for execution. This is the final v1 milestone phase.

  • Branch: gsd/phase-03-spec-10-smoke-verification-dom-event-log-verification at HEAD 55369b8 (Phase 4 branch NOT yet created — happens in /gsd-execute-phase 4 per branching_strategy=phase)
  • 7 plans validated + plan-checker iter-2 PASSED + 3 cosmetic advisories fixed
  • Test baselines: vitest 171/171 GREEN · UAT 33/33 GREEN · Tier-1 FORBIDDEN_HOOK_STRINGS 12 · pre-checkpoint bundle gates 6/6 PASS
  • Working tree: clean

Plans Ready for Execution

Plan Wave Type Scope Closes
04-01 1 tdd Audit P1 polish (RED→GREEN 3 unit tests in src/content/index.ts:147 + 99-109 + 36-42) Audit P1 #11/#14/#15
04-02 1 (parallel) tdd Build/CSP hygiene — setimmediate polyfill Option a + dead-code grep + generate-icons.cjs ROADMAP SC #3 + #4
04-03 2 auto A29 cs-injection-world rewrite (strict-sentinel filter for IncrementalSource.Mutation) ~1/3 flake from Phase 3
04-04 3 spike→auto A33 SW state persistence — Wave 0 SPIKE FIRST; chrome.runtime.sendMessage Option B ROADMAP SC #1
04-05 4 auto A34 fetch+XHR network_error empirical (validates 04-01 P1#11 end-to-end) ROADMAP SC #2
04-06 5 auto + human-verify Visual polish — dark-logo currentColor (5 UI-SPEC edits) + cursor verification + operator empirical D-P4-03
04-07 6 auto VERIFICATION.md aggregator + ROADMAP backfill + REQ marker flips + milestone v1 close prep D-P4-05 + Phase 4 closure

Wave 1 parallelization: 04-01 + 04-02 are file-disjoint (04-01 src/content/* + 04-02 vite/SW/build-tests) — safe parallel. Waves 2-6 sequential: file-overlap on tests/uat/* harness files.

Recent commit chain (most recent first)

  • 55369b8 docs(state): record phase 4 plan-phase closure — iter-2 PASSED + 3 cosmetic advisories fixed
  • 3c1280e docs(04): plan-phase closure — 3 cosmetic advisories from checker iter-2 resolved
  • 76fffb3 fix(04): revise plans per checker iter-1 — 2 BLOCKERS + 2 WARNINGS fixed
  • 526ac78 docs(04): create phase plan — 7 plans for Phase 4 hardening
  • f012c8c docs(04): pattern map — ~30 anticipated files mapped
  • 7178d14 docs(phase-04): add validation strategy
  • d1f6767 docs(04): research phase domain — 5 findings incl. cursor:'always' ALREADY shipped
  • 61caf04 docs(state): record phase 4 UI-SPEC session — APPROVED 5/6 + 1 FLAG
  • 266aa95 docs(04): UI-SPEC.md status approved (5/6 PASS + 1 FLAG non-blocking)
  • 55cefba docs(04): UI design contract — thin scope (dark-logo currentColor strategy)
  • (… Phase 3 closure + Phase 2 closure earlier)

Required Reading (in order)

  1. .planning/HANDOFF.json — machine-readable handoff (sibling)
  2. .planning/STATE.md — current progress (Phase 3 CLOSED; Phase 4 ready)
  3. .planning/ROADMAP.md — 4-phase milestone structure; Phase 4 optional
  4. .planning/REQUIREMENTS.md — all v1 REQs verified (Phase 4 has no new REQs)
  5. .planning/PROJECT.md — Validated section split by phase
  6. .planning/phases/04-harden-clean-up-optional/04-CONTEXT.md — 5 D-P4-* locked decisions
  7. .planning/phases/04-harden-clean-up-optional/04-UI-SPEC.md — thin-design-surface dark-logo (Option A currentColor; 5 prescribed file edits)
  8. .planning/phases/04-harden-clean-up-optional/04-RESEARCH.md — 5 findings; CRITICAL finding 4: cursor:'always' ALREADY SHIPPED at src/offscreen/recorder.ts:285 (Plan 04-06 cursor task = verification only)
  9. .planning/phases/04-harden-clean-up-optional/04-PATTERNS.md — ~30 files mapped + DEPRECATED banner at line 886 (citing Plan 04-04 Option B)
  10. .planning/phases/04-harden-clean-up-optional/04-VALIDATION.md — 16-row per-task verification map; iter-2 revised
  11. .planning/phases/04-harden-clean-up-optional/04-0{1..7}-PLAN.md — 7 plans ready
  12. Auto-memory at /home/parf/.claude/projects/-home-parf-projects-work-repremium/memory/MEMORY.md — 4 feedback constraints from prior sessions

Decisions Locked This Session (Phase 4)

  • D-P4-01: Full Phase 4 scope (all 4 ROADMAP SC + ~10 of 12 deferred items)
  • D-P4-02: Audit P1 all three (#11 fetch + #14 nav URL + #15 rrweb timestamps)
  • D-P4-03: Both visual polish items (cursor + dark-logo)
  • D-P4-04: Alpha tester integration user-handled out-of-band
  • D-P4-05: ROADMAP backfill in scope (docs hygiene)
  • UI-SPEC Option A: currentColor SVG + ?raw import + DOMParser inline (5 file edits)
  • Plan 04-04 Option B: chrome.runtime.sendMessage inline for SAVE_ARCHIVE dispatch (BLOCKER 2 fix — no dispatchSaveArchive helper)
  • Plan 04-06 Task 4 glob: dist/assets/index.ts-*.js (BLOCKER 1 fix + glob-existence pre-gate)
  • §10 #9 RAM closure: user explicit ack 2026-05-20 on harness scaffolding + alpha distribution coverage path

Next-Session Order of Operations

  1. /gsd-resume-work to load this .continue-here.md + .planning/HANDOFF.json
  2. Acknowledge any blocking constraints (none this session; 3 advisory anti-patterns above)
  3. /gsd-execute-phase 4 to start Phase 4 execution (~6-8h foreground; canonical Skill)
    • Alternative: /gsd-execute-phase 4 --wave 1 lands Wave 1 (04-01 + 04-02 parallel) only (~30-60 min)
  4. After Phase 4 closes: milestone v1 close prep (fresh alpha re-distribution + v1.0 tag + release notes per D-P4-04)

Infrastructure State

  • Branch: gsd/phase-03-spec-10-smoke-verification-dom-event-log-verification at HEAD 55369b8 — Phase 4 branch NOT yet created (happens in /gsd-execute-phase 4)
  • Working tree clean
  • Test baselines preserved: vitest 171/171 GREEN · UAT 33/33 GREEN · Tier-1 12 · bundle gates 6/6 PASS
  • Saved memories applied throughout: feedback-no-unilateral-scope-reduction + feedback-gsd-ceremony-for-fixes + feedback-pre-checkpoint-bundle-gates + feedback-trust-harness-over-manual-uat

Phase 4 Expected Outcomes

  • vitest: 171 → ~180 GREEN (+~10 Wave 0 unit tests: P1 #11/#14/#15 + 2 build gates + welcome inline-svg)
  • UAT harness: 33 → 35 GREEN (+A33 SW persistence + A34 fetch/XHR network_error)
  • Tier-1 FORBIDDEN_HOOK_STRINGS: 12 unchanged (A33+A34 ride production surfaces)
  • Bundle gates 6/6 PASS — Gate 2 (SW CSP-safety new Function) flips from 1 documented exception to 0 hits after Plan 04-02 setimmediate polyfill replacement
  • ROADMAP success criteria #1-#4 all verified
  • Plan 04-06 Task 4 operator empirical UAT (dark-logo aesthetic judgment in OS dark mode)
  • Milestone v1 ready for tag + release notes after Phase 4 closure

Pending Human Action (non-blocking, deferred to Phase 4 execution)

  • Plan 04-06 Task 4 operator empirical UAT — dark-logo aesthetic judgment in OS dark mode (UI-SPEC AC #6; canonical Phase 4 human-verify case)
  • All other Phase 4 surfaces are harness-covered or grep-verifiable

Context

Massive session arc: 2026-05-20 → 2026-05-21 spanning Phase 2 execution + closure, Phase 3 full lifecycle (discuss + UI + plan + execute + closure), Phase 4 full pre-execution lifecycle (discuss + UI + research + pattern + plan + 2-iteration plan-checker revision). Three phases closed end-to-end; Phase 4 fully planned + validated; ready for execution. User explicitly chose canonical GSD ceremony throughout (consistent pattern across all phases). Test baseline growth this session: vitest 153→171 GREEN (+18); UAT 24→33 GREEN (+9 incl. A24-A32). 4 saved memories cited throughout. Phase 4 is the final v1 milestone phase; after closure, milestone v1 is ready for release.

Next action

Start with: /gsd-resume-work to load this handoff, then /gsd-execute-phase 4 to start Phase 4 execution.