Mark 13b67f5136 docs(01-01): complete doc-cascade plan
Plan 01-01 (Wave-0 doc cascade) complete. Six tasks landed atomically
in commits 125c032, fb88830, b1ed2cb, 597d967, 32bc996, 4a5194e. Every
code-touching plan in Phase 1 (01-02..01-07) now reads a consistent
baseline: getDisplayMedia replaces tabCapture in DEC-003; long-lived
port replaces alarms in DEC-010; manifest.json carries the final
Phase-1 permissions set (desktopCapture, activeTab, downloads,
scripting, storage, offscreen).

SUMMARY: .planning/phases/01-stabilize-video-pipeline/01-01-SUMMARY.md
2026-05-15 17:19:48 +02:00

3.3 KiB
Raw Blame History

gsd_state_version, milestone, milestone_name, status, stopped_at, last_updated, last_activity, progress
gsd_state_version milestone milestone_name status stopped_at last_updated last_activity progress
1.0 v2.0.0 milestone executing Completed 01-01 doc cascade — Plan 01-02 next 2026-05-15T15:19:25.904Z 2026-05-15
total_phases completed_phases total_plans completed_plans percent
5 0 7 1 14

Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-05-15)

Core value: When an operator hits a bug, one click MUST produce a self-contained archive that lets support reproduce what happened — in under 5 s, no server, no password leaks. Current focus: Phase 1 — Stabilize Video Pipeline

Current Position

Phase: 1 (Stabilize Video Pipeline) — EXECUTING Plan: 2 of 7 Status: Ready to execute Last activity: 2026-05-15 REQUIREMENTS.md, ROADMAP.md, STATE.md written)

Progress: [█░░░░░░░░░] 14%

Performance Metrics

Velocity:

  • Total plans completed: 0
  • Average duration: —
  • Total execution time: —

By Phase:

Phase Plans Total Avg/Plan
1. Stabilize video pipeline 0
2. Stabilize DOM + event capture privacy 0
3. Stabilize export pipeline 0
4. SPEC §10 smoke verification 0
5. Harden + clean up 0

Recent Trend:

  • Last 5 plans: —
  • Trend: —

Updated after each plan completion | Phase 01 P01 | 4min | 6 tasks | 6 files |

Accumulated Context

Decisions

Decisions are logged in PROJECT.md Key Decisions table (DEC-001 through DEC-012, all SPEC-Accepted and locked for Phase 1). Recent decisions affecting current work:

  • Phase 1 framing: roadmap treats the existing codebase as a partially-broken first attempt to be remediated against the SPEC, not as greenfield. The 7 P0 defects from the audit are split across phases 13 along commit boundaries; phase 4 is end-to-end SPEC §10 smoke verification.

  • All 12 SPEC decisions (DEC-001..DEC-012) are LOCKED for Phase 1. Changing any of them requires a formal ADR; none are formally LOCKED in the ingest classification, so a future ADR can revise.

  • [Phase ?]: Doc cascade: amendments append (do not replace) original DEC/CON blocks to preserve SPEC provenance — Established convention for future SPEC-amending phases; downstream readers see both old + new with citation

  • [Phase ?]: Manifest: drop alarms permission entirely rather than retain for re-use — Plan 05 deletes the alarms code path; declaring unused permissions expands attack surface (T-1-02)

Pending Todos

None yet.

Blockers/Concerns

  • (informational) chrome.tabCapture requires a user gesture on first activation — Phase 3 (P0-4) restores this by moving the call into the popup click handler; until Phase 3 lands, recording cannot start cleanly even if Phase 1's pipeline is correct. Phases 13 should not be re-ordered.

Deferred Items

Items acknowledged and carried forward from previous milestone close:

Category Item Status Deferred At
(none)

Session Continuity

Last session: 2026-05-15T15:19:25.886Z Stopped at: Completed 01-01 doc cascade — Plan 01-02 next intel synthesis. Coverage validated: 11/11 v1 REQs mapped. Resume file: .planning/phases/01-stabilize-video-pipeline/01-02-PLAN.md