Plan 01-01 (Wave-0 doc cascade) complete. Six tasks landed atomically in commits125c032,fb88830,b1ed2cb,597d967,32bc996,4a5194e. Every code-touching plan in Phase 1 (01-02..01-07) now reads a consistent baseline: getDisplayMedia replaces tabCapture in DEC-003; long-lived port replaces alarms in DEC-010; manifest.json carries the final Phase-1 permissions set (desktopCapture, activeTab, downloads, scripting, storage, offscreen). SUMMARY: .planning/phases/01-stabilize-video-pipeline/01-01-SUMMARY.md
109 lines
3.3 KiB
Markdown
109 lines
3.3 KiB
Markdown
---
|
||
gsd_state_version: 1.0
|
||
milestone: v2.0.0
|
||
milestone_name: milestone
|
||
status: executing
|
||
stopped_at: Completed 01-01 doc cascade — Plan 01-02 next
|
||
last_updated: "2026-05-15T15:19:25.904Z"
|
||
last_activity: 2026-05-15
|
||
progress:
|
||
total_phases: 5
|
||
completed_phases: 0
|
||
total_plans: 7
|
||
completed_plans: 1
|
||
percent: 14
|
||
---
|
||
|
||
# Project State
|
||
|
||
## Project Reference
|
||
|
||
See: .planning/PROJECT.md (updated 2026-05-15)
|
||
|
||
**Core value:** When an operator hits a bug, one click MUST produce a
|
||
self-contained archive that lets support reproduce what happened — in under 5 s,
|
||
no server, no password leaks.
|
||
**Current focus:** Phase 1 — Stabilize Video Pipeline
|
||
|
||
## Current Position
|
||
|
||
Phase: 1 (Stabilize Video Pipeline) — EXECUTING
|
||
Plan: 2 of 7
|
||
Status: Ready to execute
|
||
Last activity: 2026-05-15
|
||
REQUIREMENTS.md, ROADMAP.md, STATE.md written)
|
||
|
||
Progress: [█░░░░░░░░░] 14%
|
||
|
||
## Performance Metrics
|
||
|
||
**Velocity:**
|
||
|
||
- Total plans completed: 0
|
||
- Average duration: —
|
||
- Total execution time: —
|
||
|
||
**By Phase:**
|
||
|
||
| Phase | Plans | Total | Avg/Plan |
|
||
|-------|-------|-------|----------|
|
||
| 1. Stabilize video pipeline | 0 | — | — |
|
||
| 2. Stabilize DOM + event capture privacy | 0 | — | — |
|
||
| 3. Stabilize export pipeline | 0 | — | — |
|
||
| 4. SPEC §10 smoke verification | 0 | — | — |
|
||
| 5. Harden + clean up | 0 | — | — |
|
||
|
||
**Recent Trend:**
|
||
|
||
- Last 5 plans: —
|
||
- Trend: —
|
||
|
||
*Updated after each plan completion*
|
||
| Phase 01 P01 | 4min | 6 tasks | 6 files |
|
||
|
||
## Accumulated Context
|
||
|
||
### Decisions
|
||
|
||
Decisions are logged in PROJECT.md Key Decisions table (DEC-001 through
|
||
DEC-012, all SPEC-Accepted and locked for Phase 1). Recent decisions affecting
|
||
current work:
|
||
|
||
- Phase 1 framing: roadmap treats the existing codebase as a partially-broken
|
||
first attempt to be remediated against the SPEC, not as greenfield. The
|
||
7 P0 defects from the audit are split across phases 1–3 along commit
|
||
boundaries; phase 4 is end-to-end SPEC §10 smoke verification.
|
||
|
||
- All 12 SPEC decisions (`DEC-001`..`DEC-012`) are LOCKED for Phase 1.
|
||
Changing any of them requires a formal ADR; none are formally LOCKED in the
|
||
ingest classification, so a future ADR can revise.
|
||
|
||
- [Phase ?]: Doc cascade: amendments append (do not replace) original DEC/CON blocks to preserve SPEC provenance — Established convention for future SPEC-amending phases; downstream readers see both old + new with citation
|
||
- [Phase ?]: Manifest: drop alarms permission entirely rather than retain for re-use — Plan 05 deletes the alarms code path; declaring unused permissions expands attack surface (T-1-02)
|
||
|
||
### Pending Todos
|
||
|
||
None yet.
|
||
|
||
### Blockers/Concerns
|
||
|
||
- (informational) `chrome.tabCapture` requires a user gesture on first
|
||
activation — Phase 3 (P0-4) restores this by moving the call into the popup
|
||
click handler; until Phase 3 lands, recording cannot start cleanly even if
|
||
Phase 1's pipeline is correct. Phases 1–3 should not be re-ordered.
|
||
|
||
## Deferred Items
|
||
|
||
Items acknowledged and carried forward from previous milestone close:
|
||
|
||
| Category | Item | Status | Deferred At |
|
||
|----------|------|--------|-------------|
|
||
| *(none)* | | | |
|
||
|
||
## Session Continuity
|
||
|
||
Last session: 2026-05-15T15:19:25.886Z
|
||
Stopped at: Completed 01-01 doc cascade — Plan 01-02 next
|
||
intel synthesis. Coverage validated: 11/11 v1 REQs mapped.
|
||
Resume file: .planning/phases/01-stabilize-video-pipeline/01-02-PLAN.md
|