- 01-02-SUMMARY.md created (Vitest 4.1.6 installed; 4 RED test files pinning Plans 03+04 contracts; tests/fixtures/.gitkeep marker) - STATE.md advanced: plan 2/7 -> 3/7; progress 14% -> 29%; metric row added; 3 decisions logged; session continuity updated - ROADMAP.md progress row updated: Phase 1 = 2/7 In Progress - REQUIREMENTS.md: REVERTED premature [x] + "Complete" marking of REQ-video-ring-buffer (Plan 01-01 mistakenly marked it; the requirement is satisfied by Plans 03+04+07's implementation + ffprobe gate, not by RED test scaffolding). Now reads "[ ]" + "In Progress" — honest state. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
113 lines
3.8 KiB
Markdown
113 lines
3.8 KiB
Markdown
---
|
||
gsd_state_version: 1.0
|
||
milestone: v2.0.0
|
||
milestone_name: milestone
|
||
status: executing
|
||
stopped_at: Plan 01-03 next (offscreen recorder TDD — flip ring-buffer + codec-check RED -> GREEN)
|
||
last_updated: "2026-05-15T15:28:03.545Z"
|
||
last_activity: 2026-05-15
|
||
progress:
|
||
total_phases: 5
|
||
completed_phases: 0
|
||
total_plans: 7
|
||
completed_plans: 2
|
||
percent: 29
|
||
---
|
||
|
||
# Project State
|
||
|
||
## Project Reference
|
||
|
||
See: .planning/PROJECT.md (updated 2026-05-15)
|
||
|
||
**Core value:** When an operator hits a bug, one click MUST produce a
|
||
self-contained archive that lets support reproduce what happened — in under 5 s,
|
||
no server, no password leaks.
|
||
**Current focus:** Phase 1 — Stabilize Video Pipeline
|
||
|
||
## Current Position
|
||
|
||
Phase: 1 (Stabilize Video Pipeline) — EXECUTING
|
||
Plan: 3 of 7
|
||
Status: Ready to execute
|
||
Last activity: 2026-05-15
|
||
REQUIREMENTS.md, ROADMAP.md, STATE.md written)
|
||
|
||
Progress: [███░░░░░░░] 29%
|
||
|
||
## Performance Metrics
|
||
|
||
**Velocity:**
|
||
|
||
- Total plans completed: 0
|
||
- Average duration: —
|
||
- Total execution time: —
|
||
|
||
**By Phase:**
|
||
|
||
| Phase | Plans | Total | Avg/Plan |
|
||
|-------|-------|-------|----------|
|
||
| 1. Stabilize video pipeline | 0 | — | — |
|
||
| 2. Stabilize DOM + event capture privacy | 0 | — | — |
|
||
| 3. Stabilize export pipeline | 0 | — | — |
|
||
| 4. SPEC §10 smoke verification | 0 | — | — |
|
||
| 5. Harden + clean up | 0 | — | — |
|
||
|
||
**Recent Trend:**
|
||
|
||
- Last 5 plans: —
|
||
- Trend: —
|
||
|
||
*Updated after each plan completion*
|
||
| Phase 01 P01 | 4min | 6 tasks | 6 files |
|
||
| Phase 01 P02 | 4min | 5 tasks | 8 files |
|
||
|
||
## Accumulated Context
|
||
|
||
### Decisions
|
||
|
||
Decisions are logged in PROJECT.md Key Decisions table (DEC-001 through
|
||
DEC-012, all SPEC-Accepted and locked for Phase 1). Recent decisions affecting
|
||
current work:
|
||
|
||
- Phase 1 framing: roadmap treats the existing codebase as a partially-broken
|
||
first attempt to be remediated against the SPEC, not as greenfield. The
|
||
7 P0 defects from the audit are split across phases 1–3 along commit
|
||
boundaries; phase 4 is end-to-end SPEC §10 smoke verification.
|
||
|
||
- All 12 SPEC decisions (`DEC-001`..`DEC-012`) are LOCKED for Phase 1.
|
||
Changing any of them requires a formal ADR; none are formally LOCKED in the
|
||
ingest classification, so a future ADR can revise.
|
||
|
||
- [Phase ?]: Doc cascade: amendments append (do not replace) original DEC/CON blocks to preserve SPEC provenance — Established convention for future SPEC-amending phases; downstream readers see both old + new with citation
|
||
- [Phase ?]: Manifest: drop alarms permission entirely rather than retain for re-use — Plan 05 deletes the alarms code path; declaring unused permissions expands attack surface (T-1-02)
|
||
- [Phase ?]: Pinned vitest at ^4 (4.1.6 latest stable; 5.x still beta on 2026-05-15)
|
||
- [Phase ?]: Phase 1 Wave-0 test infra: 4 RED tests committed against not-yet-existent src/offscreen/recorder.ts — pins contracts for Plans 03+04
|
||
- [Phase ?]: Reverted premature REQ-video-ring-buffer Complete marking left by Plan 01-01; satisfied by Plans 03+04+07, not by Wave-0 RED tests
|
||
|
||
### Pending Todos
|
||
|
||
None yet.
|
||
|
||
### Blockers/Concerns
|
||
|
||
- (informational) `chrome.tabCapture` requires a user gesture on first
|
||
activation — Phase 3 (P0-4) restores this by moving the call into the popup
|
||
click handler; until Phase 3 lands, recording cannot start cleanly even if
|
||
Phase 1's pipeline is correct. Phases 1–3 should not be re-ordered.
|
||
|
||
## Deferred Items
|
||
|
||
Items acknowledged and carried forward from previous milestone close:
|
||
|
||
| Category | Item | Status | Deferred At |
|
||
|----------|------|--------|-------------|
|
||
| *(none)* | | | |
|
||
|
||
## Session Continuity
|
||
|
||
Last session: 2026-05-15T15:27:57.027Z
|
||
Stopped at: Plan 01-03 next (offscreen recorder TDD — flip ring-buffer + codec-check RED -> GREEN)
|
||
intel synthesis. Coverage validated: 11/11 v1 REQs mapped.
|
||
Resume file: .planning/phases/01-stabilize-video-pipeline/01-03-PLAN.md
|