Plan 01-01 (Wave-0 doc cascade) complete. Six tasks landed atomically
in commits 125c032, fb88830, b1ed2cb, 597d967, 32bc996, 4a5194e. Every
code-touching plan in Phase 1 (01-02..01-07) now reads a consistent
baseline: getDisplayMedia replaces tabCapture in DEC-003; long-lived
port replaces alarms in DEC-010; manifest.json carries the final
Phase-1 permissions set (desktopCapture, activeTab, downloads,
scripting, storage, offscreen).
SUMMARY: .planning/phases/01-stabilize-video-pipeline/01-01-SUMMARY.md
After gsd-plan-phase 1: 7 plans across 7 waves. All gates pass:
- Plan-checker (sonnet) VERIFICATION PASSED on iteration 1
- Decision coverage gate (gsd-sdk): 19/19 decisions covered
- Requirements coverage: REQ-video-ring-buffer in all plans
- Security threat model: T-1-01/02/04 mitigated; T-1-03 accepted residual
Known non-blocking gaps:
- gsd-sdk roadmap.annotate-dependencies failed (t.trim is not a function);
ROADMAP plan-list annotations skipped. Phase 1 plan-list in ROADMAP.md
remains accurate; this is a cosmetic nice-to-have for cross-cutting
constraint visibility.
- 1 plan-checker warning (stale wave prose in Plan 03/04 objectives) was
fixed during decision-coverage revision.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>