- Mark .planning/debug/d12-blob-port-transfer-fails.md as
status: resolved; fill in the Resolution section with the
applied fix (5 commit hashes, files changed), verification
output (15/15 tests, tsc clean, vite build green, zero
as-any/ts-ignore in fix-touched files), and inline answers
to the specialist-review questions raised by the planner.
Move the file to .planning/debug/resolved/.
- Update STATE.md frontmatter (stopped_at) + Decisions log
+ Session Continuity to record the D-12 fix landing and
the open Plan 07 ffprobe gate (still requires operator
smoke.sh + ffprobe re-run before Phase 1 can close).
- Land smoke.sh — the operator's D-12 acceptance-gate harness
that surfaced the original failure. Self-contained: dedicated
/tmp/mokosh-smoke-profile, auto-accept desktop-capture picker,
Downloads polling, ffprobe gate, fixture staging.
REQ-video-ring-buffer remains NOT-complete — Plan 07 owns it,
operator must re-run ./smoke.sh to verify the fix end-to-end
in Chrome.
Refs: debug session d12-blob-port-transfer-fails (resolved).
Plan 05 closes: src/background/index.ts is now a pure coordinator with
zero video-buffer state, T-1-04 mitigations on both onConnect and
onMessage, OFFSCREEN_READY handshake, port-based buffer fetch via
'video-keepalive' port, IDB orphan cleanup on install, and chrome.offscreen.hasDocument()
re-sync on SW respawn (audit P1 #8). 9/9 vitest tests still green;
tsc clean; no as any / @ts-ignore.
REQ-video-ring-buffer stays pending — Plan 07's ffprobe gate owns the
final completion marker.
- Add 01-03-SUMMARY.md documenting RED -> GREEN gate (Plan 02 tests now
pass), 3 Rule-3 auto-fixes (OffscreenLogger inline, defensive
bootstrap, SW dead-code removal), and Plan 04 / 05 handoff notes.
- Update STATE.md: advance plan counter to 4 of 7 (43%), append
metrics + 3 execution decisions, record session.
- Update ROADMAP.md: mark Plan 01-03 [x] complete.
REQ-video-ring-buffer remains NOT complete — still pending Plans 04
(port keepalive) and 07 (ffprobe acceptance gate).
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
Plan 01-01 (Wave-0 doc cascade) complete. Six tasks landed atomically
in commits 125c032, fb88830, b1ed2cb, 597d967, 32bc996, 4a5194e. Every
code-touching plan in Phase 1 (01-02..01-07) now reads a consistent
baseline: getDisplayMedia replaces tabCapture in DEC-003; long-lived
port replaces alarms in DEC-010; manifest.json carries the final
Phase-1 permissions set (desktopCapture, activeTab, downloads,
scripting, storage, offscreen).
SUMMARY: .planning/phases/01-stabilize-video-pipeline/01-01-SUMMARY.md
After gsd-plan-phase 1: 7 plans across 7 waves. All gates pass:
- Plan-checker (sonnet) VERIFICATION PASSED on iteration 1
- Decision coverage gate (gsd-sdk): 19/19 decisions covered
- Requirements coverage: REQ-video-ring-buffer in all plans
- Security threat model: T-1-01/02/04 mitigated; T-1-03 accepted residual
Known non-blocking gaps:
- gsd-sdk roadmap.annotate-dependencies failed (t.trim is not a function);
ROADMAP plan-list annotations skipped. Phase 1 plan-list in ROADMAP.md
remains accurate; this is a cosmetic nice-to-have for cross-cutting
constraint visibility.
- 1 plan-checker warning (stale wave prose in Plan 03/04 objectives) was
fixed during decision-coverage revision.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>