Commit Graph

18 Commits

Author SHA1 Message Date
e035fd279d docs(01-09): Amendment 3 + 01-13 SUMMARY reversal note + STATE.md sync + debug records
Plan 01-09 Amendment 3 (2026-05-19) — atomic documentation pass for
the save-does-not-stop-recording charter reversal.

Changes:
- .planning/phases/01-stabilize-video-pipeline/01-09-PLAN.md:
  Amendment 3 block added above <success_criteria> (mirrors
  Amendment 2 placement). Describes the reversed charter,
  references the new debug record, points at the inverted
  test file + harness A14.
- .planning/phases/01-stabilize-video-pipeline/01-13-SUMMARY.md:
  "Subsequent Reversal (2026-05-19)" footer added. Notes that
  npm run test:uat still 15/15 GREEN under the inverted A14
  contract; vitest baseline preserved at 98 GREEN.
- .planning/STATE.md:
  Plan 01-13 closure block extended with CHARTER REVERSAL bullet
  citing the 4 commit SHAs (6ac23fd RED, 7645765 GREEN,
  1baaf45 A14 invert, this commit docs).
- .planning/debug/resolved/01-09-save-stops-recording.md:
  SUPERSEDED 2026-05-19 footer appended (audit trail; original
  fix was technically correct against its charter, reversal is
  UX iteration not technical defect).
- .planning/debug/resolved/01-09-save-does-not-stop-recording.md:
  NEW debug record landed directly in resolved/ (no checkpoint
  cycle — orchestrator-diagnosed reversal). Documents symptom,
  charter clarification cycle, fix shape, RED→GREEN evidence
  with commit SHAs + vitest/harness output, anti-regression
  coverage at unit + E2E layers.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-19 17:50:49 +02:00
285e46f620 docs(01-13): close — operator UAT ack 2026-05-19 + save-stops debug resolved + SUMMARY landed
Plan 01-13 fully closed. Operator UAT acked "all good" on 2026-05-19;
recovery flow (A7) + restart-after-click (A2) both harness-covered, no
manual verification needed.

What this commit lands:
- 01-13-SUMMARY.md (full spike-pivot-then-implementation narrative; tracks
  all 16 commits across Plan 01-11 spike + Plan 01-13 4-wave execution +
  save-stops debug session; documents 15/15 npm run test:uat GREEN +
  98/98 vitest GREEN + Bug A/B regression-rewind demos verified)
- Save-stops debug record moved to .planning/debug/resolved/ (closure-
  canonical location; prior inline path tracked via git mv)
- STATE.md sync: completed_plans 11→12, percent 95→96, Plan 01-13
  fully-closed narrative + save-stops debug session captured

Phase 1 functional contract: CLOSED via harness PASS.
Remaining Phase 1 gates: Plan 01-10 (welcome tab) + Plan 01-12 (design
integration; pending designer Newsreader-Cyrillic reply).

Phase 2 inherits the harness as its closure-gate template.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-19 13:46:49 +02:00
9c5ff8b2a7 docs(01-13): wave-4 task-8 — Plan 01-09 closure-via-harness amendment + STATE.md sync
Lands the Wave 4 closure docs:
- 01-09-PLAN.md Amendment 2: harness PASS (npm run test:uat 14/14 GREEN at d793c9e)
  now closes Plan 01-09 functional contract (original Task 5 steps 4, 5, 7-13, 15);
  operator retains only step 1 (build) + step 14 (brand/design ack — Plan 01-13
  Task 9 charter). Coverage map table pins each retired manual step to its
  corresponding harness assertion (A1-A13).
- STATE.md sync: completed_plans 9->11, percent 92->~95, last_updated
  2026-05-19T10:40:00Z; Current Position narrative replaced with Plan 01-13
  landing summary + outstanding Phase 1 gates (Plan 01-13 Task 9 operator
  checkpoint, Plan 01-10 welcome tab, Plan 01-12 design integration awaiting
  designer reply).

Verification (post-edit, docs-only — no src/ touched):
- npm run test:uat: 14/14 GREEN at d793c9e baseline preserved
- npx vitest: 94/94 (the no-test-hooks-in-prod-bundle.test.ts default 5s timeout
  flake is harness-side, not introduced by this commit; re-run with
  --testTimeout=60000 passes)
- git status post-commit: clean

Followup: ROADMAP.md is missing entries for Plans 01-08 through 01-12 (these were
all added mid-phase across multiple sessions and the roadmap was never amended;
the Phase-1 Plans block lines 74-80 stops at 01-07 and the progress table line
238 shows the stale '7/7 Complete' count). Backfilling those entries is a
separate concern — out of scope for Plan 01-13 closure per plan-checker flag #4
(hold the line; do not inject). STATE.md notes the counter > total mismatch for
visibility.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-19 10:50:13 +02:00
6dca46529b chore(01-09): resume from pause — sync STATE.md, remove HANDOFF.json
HANDOFF.json artifact consumed per /gsd-resume-work workflow
(one-shot resumption pointer). STATE.md synced forward to reflect
true mid-Plan-01-09 state — status flipped planning→executing,
progress 90→92, Current Position now shows Phase 1 REOPENED with
Plan 01-09 Bug B pending and Plan 01-10 Wave 3 pending.

Session continuity records:
- Pause checkpoint commit:  ed82fd6
- Bug A icons commit:       a881bf0
- Intel docs unlock commit: f768498
- Next: /gsd-debug session for Bug B state-machine routing

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-17 16:30:54 +02:00
bc310d98cf revert(01): reopen Phase 1 — D-13 multi-EBML-concat is unplayable
REQ-video-ring-buffer flipped from [x] back to [ ]. ROADMAP.md Phase 1
row reverted from [x] Closed 2026-05-15 to [ ] reopened 2026-05-16.
STATE.md status flipped phase_complete → phase_reopened with full
historical narrative preserved.

Root cause (confirmed at byte level by gsd-debugger 2026-05-16):
D-13's concat-of-self-contained-WebM-segments architecture produces a
3-EBML-header WebM that standards-compliant Matroska parsers
(mpv, ffmpeg, Chrome HTMLMediaElement) play only as the first segment
(~9.94 s) and silently drop the remaining 2 segments. Confirmed via
operator mpv drag-drop test of BOTH the canonical 2026-05-15 closure
fixture and the 2026-05-16 UAT-produced fixture — both exhibit the
same broken playback.

The 2026-05-15 "operator-confirmed clean Chrome playback" assessment
was insufficient: it verified the file plays without freezing but did
not measure total duration. Phase 1's primary deliverable
(REQ-video-ring-buffer / SPEC §10 #7) is therefore NOT satisfied.

Fix path chosen by user: ts-ebml (parse) + webm-muxer (write) to
replace mergeVideoSegments file-concat with real single-EBML remux.
Will land as Plan 01-08 via fresh /gsd-plan-phase ceremony.

RED test landed in tests/offscreen/webm-playback.test.ts (2 new
assertions on container-format-duration + ffmpeg-full-decode-duration).
2 failures, 53 baseline tests still GREEN.

Option C port-lifecycle refactor (debug session
empty-archive-port-race, commits 674c415..f0871c0) DID land cleanly
and is retained — that fix was orthogonal and correctly resolved the
silent-empty-archive symptom that previously masked this deeper bug.

Debug session: .planning/debug/d13-multi-ebml-concat-unplayable.md

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-16 19:47:47 +02:00
75b88c6219 chore(session): consume HANDOFF.json + refresh STATE session continuity after resume
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-16 11:07:42 +02:00
7df72aaa60 feat(01-07): close Phase 1 — REQ-video-ring-buffer complete, SPEC §10 #7 satisfied
Phase 1 closure 2026-05-15 — both acceptance gates green:

- D-12 ffprobe structural gate: `ffprobe -v error -f matroska -i
  tests/fixtures/last_30sec.webm` exit 0 (cd61cbc)
- A3 empirical-playback gate: operator confirmed clean end-to-end Chrome
  playback (no ~1 s freeze); ffmpeg `-v warning -i fixture -f null -`
  exit 0 with zero decoder errors (only expected muxer DTS-monotonicity
  warnings at segment join boundaries — documented D-13 trade-off for
  multi-EBML-header WebM concat; Chrome's MSE pipeline handles this
  natively, satisfying SPEC §10 #7)

Changes:

- .planning/REQUIREMENTS.md
  * REQ-video-ring-buffer checkbox [ ] -> [x]; description AMENDED to
    document the D-13 restart-segments lifecycle replacing D-09..D-11;
    SPEC §10 #2, #3, #7 noted as green 2026-05-15
  * Traceability table row: REQ-video-ring-buffer | Phase 1 | Complete
    (was Pending)

- .planning/ROADMAP.md
  * Phase 1 list-item flipped [ ] -> [x] with closure date + summary
  * Phase 1 Success Criteria 1, 2, 3 individually checked off; criterion 2
    re-worded to reflect D-13 segment-cycling (replacing the original
    single-continuous-recorder wording from D-09..D-11)
  * Plan list: 01-07-PLAN.md flipped [ ] -> [x] with closure note
  * Progress table row: 7/7 Complete 2026-05-15 (was 6/7 In Progress)
  * Phase 5 P1/P2 list: appended `getDisplayMedia` cursor visibility
    constraint (`video: { cursor: 'always' }`) — surfaced as user
    observation during Phase 1 smoke 2026-05-15

- .planning/STATE.md
  * Frontmatter: status -> phase_complete, completed_phases 0 -> 1,
    completed_plans 6 -> 7, percent 86 -> 100; stopped_at + last_activity
    rewritten for closure narrative
  * Current Position: Phase 1 COMPLETE, next Phase 2 of 5, Plan 7/7
    complete, progress bar [██████████] 100% Phase 1
  * Performance Metrics: Phase 1 row populated (7 plans, ~50 min); added
    Plan 07 row with closure narrative incl. the two debug sessions
  * Decisions log: appended [Phase 01-07-closure] decision and
    [Phase 01-07-deferred-to-5] note for the cursor-visibility refinement
  * Session Continuity: rewritten for closure; resume file points to the
    Plan 07 SUMMARY (commit 3)
  * Added "Phase 1 Closure Notes" block with ffprobe + ffmpeg gates,
    fixture metadata, test counts, criteria green-status, and a process
    retro candidate (auto-injection of empirical-acceptance gates when
    RESEARCH.md flags HIGH-risk assumptions)

Refs: .planning/debug/resolved/d12-blob-port-transfer-fails.md,
.planning/debug/resolved/webm-playback-freeze.md
2026-05-15 21:58:38 +02:00
872f25d649 docs(fix-a3): resolve webm-playback-freeze debug session, update STATE
Closes the second debug session in Phase 1's life (after d12). Both
sessions resolved fast — ~30 min for d12, ~15 min for the RED-test
landing in this one — because the planner had explicitly pre-staged
contingencies (D-12 ffprobe gate + D-13 restart-segments skeleton)
for the assumptions RESEARCH.md flagged HIGH-risk. Neither was a
planning oversight; both were the documented HIGH-risk assumption
activating as expected.

Changes:
- Moved .planning/debug/webm-playback-freeze.md →
  .planning/debug/resolved/webm-playback-freeze.md (status:
  root-cause-confirmed → resolved).
- Added the Resolution section: root-cause one-liner, applied-fix
  description, the 5 files-changed list, the 6 fix-a3 commit hashes,
  the in-tree verification matrix, and the explicit operator
  next-step (re-run ./smoke.sh, verify Chrome playback +
  ffmpeg-clean stderr + the 2 webm-playback.test.ts assertions
  flipping GREEN, then Phase 1 closes).
- Updated STATE.md frontmatter `stopped_at`, the Decisions log
  with a [Phase 01-07-debug-a3] entry summarising D-13 activation
  + the type renames + the retired old-API surface, and the
  Session Continuity block (timestamp, stopped_at narrative,
  resume-file pointer).

Phase 1 close is still pending operator regen of
tests/fixtures/last_30sec.webm. REQ-video-ring-buffer must not
be marked complete by this commit — Plan 07's §10 #7 acceptance
criterion owns that and only the in-Chrome playback + ffmpeg-clean
stderr (against a freshly regenerated fixture) can close it.
2026-05-15 21:18:36 +02:00
bf076199b4 docs(fix-d12): resolve debug session and update STATE
- Mark .planning/debug/d12-blob-port-transfer-fails.md as
  status: resolved; fill in the Resolution section with the
  applied fix (5 commit hashes, files changed), verification
  output (15/15 tests, tsc clean, vite build green, zero
  as-any/ts-ignore in fix-touched files), and inline answers
  to the specialist-review questions raised by the planner.
  Move the file to .planning/debug/resolved/.
- Update STATE.md frontmatter (stopped_at) + Decisions log
  + Session Continuity to record the D-12 fix landing and
  the open Plan 07 ffprobe gate (still requires operator
  smoke.sh + ffprobe re-run before Phase 1 can close).
- Land smoke.sh — the operator's D-12 acceptance-gate harness
  that surfaced the original failure. Self-contained: dedicated
  /tmp/mokosh-smoke-profile, auto-accept desktop-capture picker,
  Downloads polling, ffprobe gate, fixture staging.

REQ-video-ring-buffer remains NOT-complete — Plan 07 owns it,
operator must re-run ./smoke.sh to verify the fix end-to-end
in Chrome.

Refs: debug session d12-blob-port-transfer-fails (resolved).
2026-05-15 20:23:29 +02:00
1ebfb42b30 docs(01-06): complete vite.config.ts collapse plan
- 01-06-SUMMARY.md: detailed write-up — 226 → 21 lines, Outcome A
  reconciliation (dist/src/offscreen/index.html), full dist layout
  for Plan 07's smoke test, T-1-NEW-06-01 / T-1-NEW-06-02 grep gates
- STATE.md: completed_plans 5 → 6, percent 71 → 86, current plan
  advanced 6 → 7, two new decisions logged, session stopped_at updated
- ROADMAP.md: Phase 1 plan progress row 4/7 → 6/7; 01-06-PLAN.md
  checked off

REQ-video-ring-buffer remains unchecked — Plan 07 owns the ffprobe gate.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-15 18:17:43 +02:00
9e236cbc7b docs(01-05): complete SW shrink + port host plan
Plan 05 closes: src/background/index.ts is now a pure coordinator with
zero video-buffer state, T-1-04 mitigations on both onConnect and
onMessage, OFFSCREEN_READY handshake, port-based buffer fetch via
'video-keepalive' port, IDB orphan cleanup on install, and chrome.offscreen.hasDocument()
re-sync on SW respawn (audit P1 #8). 9/9 vitest tests still green;
tsc clean; no as any / @ts-ignore.

REQ-video-ring-buffer stays pending — Plan 07's ffprobe gate owns the
final completion marker.
2026-05-15 18:07:07 +02:00
05d00509bf docs(01-04): complete offscreen port keepalive + OFFSCREEN_READY handshake plan
- Add 01-04-SUMMARY.md with TDD RED/GREEN/REFACTOR gate records,
  acceptance grep gates, threat mitigations (T-1-04, T-1-NEW-04-01),
  Plan 05 SW-side handoff (REQUIRED sender.id === chrome.runtime.id
  check), and 1 Rule 1 deviation documented
- Advance STATE.md Plan counter 4 → 5, progress 43% → 57%
- Append 3 decisions to STATE.md Accumulated Context
- Update ROADMAP.md: 01-04-PLAN checkbox → [x], phase progress row 3/7 → 4/7

REQ-video-ring-buffer NOT marked complete — still pending Plan 07
ffprobe D-12 gate per the requirement's traceability.
2026-05-15 17:54:04 +02:00
30e5efd364 docs(01-03): complete offscreen recorder TDD plan
- Add 01-03-SUMMARY.md documenting RED -> GREEN gate (Plan 02 tests now
  pass), 3 Rule-3 auto-fixes (OffscreenLogger inline, defensive
  bootstrap, SW dead-code removal), and Plan 04 / 05 handoff notes.
- Update STATE.md: advance plan counter to 4 of 7 (43%), append
  metrics + 3 execution decisions, record session.
- Update ROADMAP.md: mark Plan 01-03 [x] complete.

REQ-video-ring-buffer remains NOT complete — still pending Plans 04
(port keepalive) and 07 (ffprobe acceptance gate).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-15 17:42:21 +02:00
edc605d475 docs(01-02): complete wave-0 test infrastructure plan
- 01-02-SUMMARY.md created (Vitest 4.1.6 installed; 4 RED test files
  pinning Plans 03+04 contracts; tests/fixtures/.gitkeep marker)
- STATE.md advanced: plan 2/7 -> 3/7; progress 14% -> 29%; metric row
  added; 3 decisions logged; session continuity updated
- ROADMAP.md progress row updated: Phase 1 = 2/7 In Progress
- REQUIREMENTS.md: REVERTED premature [x] + "Complete" marking of
  REQ-video-ring-buffer (Plan 01-01 mistakenly marked it; the requirement
  is satisfied by Plans 03+04+07's implementation + ffprobe gate, not by
  RED test scaffolding). Now reads "[ ]" + "In Progress" — honest state.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-15 17:28:49 +02:00
13b67f5136 docs(01-01): complete doc-cascade plan
Plan 01-01 (Wave-0 doc cascade) complete. Six tasks landed atomically
in commits 125c032, fb88830, b1ed2cb, 597d967, 32bc996, 4a5194e. Every
code-touching plan in Phase 1 (01-02..01-07) now reads a consistent
baseline: getDisplayMedia replaces tabCapture in DEC-003; long-lived
port replaces alarms in DEC-010; manifest.json carries the final
Phase-1 permissions set (desktopCapture, activeTab, downloads,
scripting, storage, offscreen).

SUMMARY: .planning/phases/01-stabilize-video-pipeline/01-01-SUMMARY.md
2026-05-15 17:19:48 +02:00
acb9033293 docs(01): record Phase 1 planning complete (7 plans, 7 waves)
After gsd-plan-phase 1: 7 plans across 7 waves. All gates pass:
- Plan-checker (sonnet) VERIFICATION PASSED on iteration 1
- Decision coverage gate (gsd-sdk): 19/19 decisions covered
- Requirements coverage: REQ-video-ring-buffer in all plans
- Security threat model: T-1-01/02/04 mitigated; T-1-03 accepted residual

Known non-blocking gaps:
- gsd-sdk roadmap.annotate-dependencies failed (t.trim is not a function);
  ROADMAP plan-list annotations skipped. Phase 1 plan-list in ROADMAP.md
  remains accurate; this is a cosmetic nice-to-have for cross-cutting
  constraint visibility.
- 1 plan-checker warning (stale wave prose in Plan 03/04 objectives) was
  fixed during decision-coverage revision.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-15 17:09:09 +02:00
4909f3155a docs(state): record phase 1 context session .planning/STATE.md 2026-05-15 15:40:51 +02:00
89ca09ccec docs: bootstrap .planning/ via /gsd-ingest-docs (2 docs) /home/parf/projects/work/repremium/.planning/PROJECT.md /home/parf/projects/work/repremium/.planning/REQUIREMENTS.md /home/parf/projects/work/repremium/.planning/ROADMAP.md /home/parf/projects/work/repremium/.planning/STATE.md /home/parf/projects/work/repremium/.planning/intel /home/parf/projects/work/repremium/.planning/INGEST-CONFLICTS.md /home/parf/projects/work/repremium/.ingest-manifest.yaml 2026-05-15 15:16:30 +02:00