f20a1e0723
docs(phase-04): ship milestone v1 — PR #1 opened on Gitea
...
Origin remote bootstrapped (Gitea git.verition.ru:repremium/mokosh).
Pushed main + gsd/phase-04-harden-clean-up-optional (297 commits, no
conflicts vs main@acb9033). PR #1 opened with comprehensive body:
4-phase breakdown, 10/11 REQ validation, 4 independent gsd-verifier
audits (all passed), 3 Phase-4 /gsd-debug sessions, deferred items
table (v1.1 + v2 candidates), reviewer test plan.
PR: #1
Branch: gsd/phase-04-harden-clean-up-optional → main
Verification: ✓ Passed (4/4 phases)
Requirements: 10/11 validated (REQ-password-confidentiality v2 candidate per user)
Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com >
2026-05-31 17:31:59 +02:00
0d1726bf75
docs(phase-04): closure ceremony — milestone v1 complete
...
phase.complete CLI ran (commit n/a — CLI in-mem only) with documented
defects per recurring state.record-session bug:
- completed_phases stuck at 3 (should be 4)
- percent regressed to 75% (3/4 math; should be 100% — milestone-complete)
- ROADMAP Phase 4 row still [ ] despite roadmap_updated:true claim
Manual fix applied per saved memory (canonical workaround for CLI bug):
STATE.md:
- completed_phases: 3 → 4
- percent: 75 → 100
- progress bar: [█████████▓] 97% → [██████████] 100%
ROADMAP.md:
- Phase 4 row: [ ] → [x] with comprehensive closure annotation
(8 plans + 3 debug sessions + 4 ROADMAP SCs + 5 D-P4-* + UAT
33→36 + vitest 171→188 + bundle gates 6/6 + Tier-1 12 + Tier-2 added
+ operator ack 2026-05-26 + verifier audit PASSED 8ffc6cb )
Phase 4 closed end-to-end. Milestone v1 v2.0.0 complete (status:
milestone_complete already correctly set by CLI). Ready for v1.0 tag +
alpha redistribution per D-P4-04 (user routes out-of-band).
2026-05-26 14:44:25 +02:00
5d0b40c9b6
docs(04-07): closure markers — REQUIREMENTS + ROADMAP + STATE + PROJECT for Phase 4 v1 close-prep
...
Task 2 of Plan 04-07 — 4 marker file flips landing Phase 4 closure-prep
(NOT formal Phase 4 closure; that happens at the ceremony AFTER the
independent gsd-verifier audit per Phase 1-3 precedent).
ROADMAP.md:
- Plan 04-07 row flipped [ ] → [x] with full closure annotation (04-VERIFICATION.md
citation + Phase 4 cumulative totals + D-P4-05 backfill verification + closure-
ceremony deferral note)
- Phase 4 progress table cell updated 7/8 → 8/8 with full closure-prep narrative
- Phase 4 row [ ] LEFT UNFLIPPED — verifier audit + closure ceremony flips it
STATE.md:
- progress.completed_plans: 29 → 30 + progress.percent: 93 → 97
- progress.completed_phases: 3 (UNCHANGED) + status: executing (UNCHANGED)
- stopped_at + last_updated + last_activity updated for Plan 04-07 closure
- Current Position block updated to reflect Plan 04-07 completion + pending
closure ceremony
- Plan 04-07 closure section added at top of body
- Performance metrics row added for Phase 04 P07
- Session Continuity entry prepended for Plan 04-07
- 2 Phase 04-07 decisions appended to Decisions list
REQUIREMENTS.md:
- 4 Phase 4 closure notes appended to existing REQ blocks (no existing REQ-*
lines modified):
- REQ-video-ring-buffer: ROADMAP SC #1 via Plan 04-08 (methodology reframe)
- REQ-rrweb-dom-buffer: A29 cs-injection-world + UAT 33→36 GREEN summary
- REQ-user-event-log: ROADMAP SC #2 via Plan 04-05 + audit P1 #11/#14/#15
via Plan 04-01
- REQ-install-clean: ROADMAP SC #3/SC #4/Plan 04-02 build hygiene + Plan
04-08 Tier-2 leak gate
- Trailing footer line updated with 2026-05-26 Phase 4 closure citation
PROJECT.md:
- NEW Validated in Phase 4 section added (7 bullets covering all closures)
- Active section evolved from Phase 4 backlog → Phase 4 closure-ceremony
workstream + Deferred-to-v1.1/v2 maintenance milestone items
- Trailing footer line updated with 2026-05-26 Phase 4 closure citation
Acceptance criteria gates (all PASS per Plan 04-07 Task 2):
- ROADMAP.md 04-07 row [x] = 1
- ROADMAP.md Phase 4 row [x] = 0 (correctly LEFT unflipped)
- STATE.md completed_phases: 3 = 2 (frontmatter + body — UNCHANGED per spec)
- STATE.md completed_plans: 30 = 1 (incremented by 1)
- STATE.md status: executing = 1 (UNCHANGED per spec)
- REQUIREMENTS.md "Phase 4 closure note" mentions = 4 (>= 3)
- PROJECT.md "Validated in Phase 4" section = 1
- git diff --stat HEAD~1 HEAD shows only .planning/ files dirty (T-04-07-02
threat mitigation gate honored — docs-only commit; no source/test changes)
Phase 4 row + completed_phases bump + status:completed flip explicitly
DEFERRED to closure ceremony after the independent gsd-verifier audit
per Phase 1-3 precedent (executor creates VERIFICATION.md; verifier
independently re-validates with goal-backward audit; orchestrator flips
markers post-verifier-audit).
2026-05-26 14:08:17 +02:00
c790c6a8b3
docs(04-06): complete visual polish + dark-logo decoupling — D-P4-03 closed (UAT 36/36 GREEN; 188/188 vitest with #9/#10 flake tolerated; operator re-confirmed 2026-05-26)
...
Plan 04-06 closure — the most ceremony-heavy plan in Phase 4: 3 planner
passes + 2 plan-checker passes + 4 task commits + 1 /gsd-debug fix cycle
+ this closure commit. D-P4-03 (locked, 04-CONTEXT.md) CLOSED — both
visual polish items: (a) cursor visibility verification + (b) dark-surface
logo contrast.
Closure trail:
6a989e8 mis-diagnosed strict-meta-json deferred-items entry
b59bd24 re-plan iter-1 — correct false jsdom premise + back-patch lines
deb68df re-plan-checker iter-1 — ITERATE-NEEDED (2 BLOCKER)
f3baa3a re-plan iter-2 — real A35 + corrected 184/184 baseline
48c7053 re-plan-checker iter-2 — PASSED (0B + 0W + 3 cosmetic-advisories)
f0b88d4 Task 1 — Wave 0 RED inline-SVG source-contract + cursor pin
c416143 Task 2 — Wave 1 GREEN SVG+welcome.ts+globals.d.ts
3f8e31a Task 3 — A35 driver + A17.8 narrowed + back-patch + correction
d66cbf6 Task 4 artifact — operator-empirical screenshot harness
(Task 4 first operator empirical: TWEAK verdict 2026-05-26)
a8bcc17 debug-fix — decouple via --mks-mark-stroke + A35.5 sub-check
(Task 4 re-empirical: CONFIRMED FIXED 2026-05-26)
THIS closure (SUMMARY + STATE.md + ROADMAP.md + debug archive)
Key deliverables:
- mokosh-mark.svg stroke="#181b2a" -> stroke="currentColor"
- welcome.ts ?url/<img> -> ?raw/DOMParser/replaceChildren inline-<svg>
- globals.d.ts *.svg?raw ambient decl
- src/shared/tokens.css NEW --mks-mark-stroke = var(--mks-linen-50) in :root
(NOT overridden in .dark — theme-independent brand-component token)
- src/welcome/welcome.css .welcome-hero__mark rewired to --mks-mark-stroke
- NEW A35 host-side harness (5 sub-checks incl. A35.5 light+dark equality
decouple-proof) at tests/uat/lib/harness-page-driver.ts
- A17.8 honestly narrowed to SOURCE-BUNDLING only; points to A35
- tests/welcome/inline-svg.test.ts (3 source-contract tests)
- tests/build/cursor-visibility.test.ts (1 regression pin)
- scripts/04-06-welcome-hero-screenshots.mjs (reproducible artifact)
- 01-07-SUMMARY back-patch (5 stale lines flipped; 4 historical left)
- deferred-items.md mis-diagnosis correction
Baselines preserved:
- vitest 188/188 GREEN (most recent 187/188 with 04-CONTEXT #9/#10
webm-remux flake; passes in isolation; tolerated per Task 2 gate)
- UAT 36/36 GREEN; FORBIDDEN_HOOK_STRINGS unchanged at 12
- Pre-checkpoint bundle gates 6/6 PASS at both checkpoint + re-checkpoint
- All 4 ROADMAP SC CLOSED; D-P4-03 CLOSED
Phase 4 progress: 6/8 -> 7/8 (Plan 04-07 NEXT).
SUMMARY: .planning/phases/04-harden-clean-up-optional/04-06-SUMMARY.md
Debug session archived: .planning/debug/resolved/04-06-dark-mode-mark-decouple.md
2026-05-26 13:14:41 +02:00
28ebc1fe4e
docs(04-05): complete A34 fetch+XHR network_error empirical plan
...
- 04-05-SUMMARY.md: A34 assertion closes ROADMAP SC #2 (fetch + XHR
network_error capture); Plan 04-01 P1 #11 Request-narrow fix
validated end-to-end; skip-mode UAT 34->35/35 GREEN
- STATE.md: position advanced (6/8 plans); Plan 04-05 closure note;
decision-log entry; A33 full-mode SAVE-ack flake logged as Blocker
(routed to /gsd-debug — Plan 04-08 deliverable, out of scope here)
- ROADMAP.md: SC #2 STATUS CLOSED; 04-05 row [x]; Phase 4 progress 6/8
- All 4 ROADMAP success criteria now closed (SC #1 Plan 04-08, SC #2
this plan, SC #3+#4 Plan 04-02)
Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com >
2026-05-22 13:02:58 +02:00
125269dcc5
docs(04-08): complete harden-clean-up-optional plan 04-08 — STATE.md advance to 6/7
...
State counter advance after Plan 04-08 closure:
- progress.completed_plans: 27 -> 28
- Current Plan position: 5 -> 6 (Plan 04-05 fetch+XHR queued next)
- last_updated timestamp + last_activity bumped to 2026-05-22
Note: the human-readable "Plan: 6 of 7" line in Current Position reflects the
original Phase 4 plan-count of 7; the ROADMAP-side phase tracker now shows
5/8 (Plan 04-08 inserted Wave 5.5 per debug session-2 verdict authorization).
This is a known cosmetic gap in the SDK's state.advance-plan handler; the
frontmatter total_plans=31 / completed_plans=28 are correct.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-22 11:08:30 +02:00
4d6c00526e
feat(04-08): A33 SW state persistence harness assertion — methodology reframe (34/34 GREEN; ROADMAP SC #1 CLOSED)
...
Task 2 of Plan 04-08 (revive A33 under valid methodology + close ROADMAP SC #1 ):
- Append driveA33(page, browser, extensionId, downloadsDir) at tests/uat/lib/harness-page-driver.ts:2516-2697 per Plan 04-04 Pattern 4 verbatim
- 3 checks: A33.1 SAVE_ARCHIVE ack success after 5-min idle + SW kill; A33.2 video size > 0; A33.3 video size > 100 KB sanity floor
- Reuses stopServiceWorker helper (Plan 04-04 commit 3726eee ) + findLatestZip (Plan 04-04 exported helper) + assertA2 prime (canonical "go to REC" entrypoint per REVISION iter-2 Option B) + inline chrome.runtime.sendMessage SAVE_ARCHIVE dispatch from harness-page realm
- 3-file lockstep wiring at tests/uat/harness.test.ts: (1) import block adds driveA33 after driveA32; (2) wrapped-driver block adds driveA33Wrapped const after driveA31Wrapped; (3) drivers-array push appends A33 entry with SKIP_LONG_UAT env-gate (default RUN for Phase 4 closure + alpha gate)
Spike re-run evidence (HEADLESS=1 npx tsx tests/uat/spike-a33-sw-persistence.ts; 309.5s wall-clock):
- SPIKE PROBE [POST-PRIME]: segments.length=0 (baseline; no rotations yet)
- SPIKE PROBE [PRE-KILL]: segments.length=3 (5-min idle drove rotation cadence to MAX_SEGMENTS)
- SPIKE PROBE [POST-KILL]: segments.length=3 (architecture preserved across SW kill — debug session-2 verdict confirmed)
- SPIKE RESULT [CANONICAL]: videoSize=1,797,178 bytes (1.8 MB; vs 8505 baseline; ~211x larger)
- SPIKE OUTCOME: PASSED (offscreen SURVIVED the 5-min idle + SW kill)
Sample segment sizes during 5-min idle: 536921, 539874, 577234, 611683, 596512, 541658, 680729, 617089, 597527, 585310 bytes (all ~500-680 KB; per 10s @ ~400 kbps VP9 per CON-video-codec).
UAT before/after:
- Skip-mode UAT (HEADLESS=1 SKIP_PROD_REBUILD=1 SKIP_LONG_UAT=1 npm run test:uat): 34/34 GREEN in ~95s (A33 placeholder PASSES under skip env)
- vitest baseline flipped 183 -> 184 GREEN (+1 from Tier-2 production-bundle filename-leak gate landed in Task 1)
ROADMAP SC #1 closure (.planning/ROADMAP.md):
- STATUS line flipped OPEN -> CLOSED with Plan 04-08 cite + 2026-05-22 date
- Plan list adds new 04-08-PLAN.md row + amends 04-04-PLAN.md row with REFUTED-architecture verdict cross-reference (debug session-2 commit 4ea1bbb )
- Phase tracker cell updated from `4/7 In Progress` to `5/8 In Progress`
- WARNING 4 grep gates verified PASS: `CLOSED via Plan 04-08`=1; `STATUS 2026-05-21: OPEN`=0; `STATUS 2026-05-22: CLOSED`=1
Pre-checkpoint bundle gates 6/6 PASS:
- new Function=0 + eval=0 + Buffer.=1 (pre-existing JSZip polyfill) + window./document.=0 in SW chunk
- Tier-1 FORBIDDEN_HOOK_STRINGS lockstep at 12 entries (unchanged)
- Tier-2 production-bundle filename-leak gate (NEW from Task 1): synthetic-display-source = 0 hits in dist/
- en/ru parity preserved
- npx tsc --noEmit: exit 0
Architecture integrity preserved per debug session-2 verdict:
- src/offscreen/recorder.ts:91 `let segments: Blob[] = []` is UNCHANGED (grep gate enforces)
- NO IndexedDB persistence work; NO chrome.storage migration; NO offscreen-document lifecycle changes
- IndexedDB persistence plan-fix recommendation from Plan 04-04 SUMMARY REJECTED (would not have closed SC #1 because segments are not the problem, frames were)
Persisting artifacts from Plan 04-04 repurposed under valid methodology:
- stopServiceWorker helper (commit 3726eee ): reused verbatim by driveA33
- tests/uat/spike-a33-sw-persistence.ts (commit 3726eee + session-2 Step B/C): now PASSES as canonical regression-verification gate
Self-Check: PASSED. All claims verified per executor protocol §self_check.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-22 11:07:48 +02:00
e8a2e7696d
docs(04-04): complete harden-clean-up-optional plan 04-04 — SW persistence spike FAILED, plan-fix ceremony required
...
Plan 04-04 (spike→auto) closes at Task 1 (Wave 0 SPIKE) with an empirical
NO on the RESEARCH Q2 MEDIUM-confidence hypothesis A3 (offscreen-document
independent lifecycle anchored by active MediaRecorder). Task 2 (Wave 1
A33 verification-only harness assertion) BLOCKED by the plan's explicit
gating condition (videoSize > 100_000); ROADMAP SC #1 remains OPEN.
Spike empirical numbers (one HEADLESS=1 run; 308.7s wall-clock; full log
at /tmp/04-04-spike.log; reproducible via the committed spike script):
- assertA2 prime: PASSED (REC state established)
- 5-min wall-clock idle: elapsed cleanly
- stopServiceWorker CDP: succeeded (worker.close() returned)
- SAVE_ARCHIVE ack: {success: true} (event-driven SW respawn worked)
- video/last_30sec.webm: 8505 bytes (sanity floor 100 KB; healthy 1-3 MB)
- ffprobe on extracted: 'End of file' + 'Duplicate element' (no clusters)
- rrweb/session.json: [] (empty)
- logs/events.json: [] (empty)
- meta.urls: chrome-extension://* only (real-page URLs LOST)
Conclusion: src/offscreen/recorder.ts:91 `let segments: Blob[] = []` RAM-
only architecture does NOT survive 5-min SW idle + Puppeteer CDP worker.
close(). Architectural change required to close ROADMAP SC #1 (canonical
recommendation per 04-RESEARCH.md Q2 sub-question b Option C: IndexedDB
persistence in offscreen — Blobs serialize cleanly via structured-clone;
per-segment write ~3 MB; ~3 writes per 30s window). Per saved memory
`feedback-gsd-ceremony-for-fixes.md` the architectural fix routes through
/gsd-plan-phase rewrite OR /gsd-debug ceremony — NOT improvised inline
inside Plan 04-04.
Task 1 persisting artifacts (committed at 3726eee ):
- tests/uat/lib/harness-page-driver.ts: +43/-6 lines
- Browser type added to puppeteer import
- stopServiceWorker(browser, extensionId) helper (Chrome devrel
canonical pattern; Puppeteer >=22.1.0 worker.close())
- findLatestZip exported (was module-internal)
- tests/uat/spike-a33-sw-persistence.ts NEW +202 lines
- One-shot reproducible empirical investigation script
- Reusable for future SW-lifecycle regression (the eventual plan-fix
re-runs this script as its A33-verification gate)
- Committed (not deleted) per the spike-FAILED forensic-evidence pattern
Task 2 was NOT committed (BLOCKED by gating condition); UAT count stays
33/33; Tier-1 FORBIDDEN_HOOK_STRINGS inventory unchanged at 12; A33 not
introduced.
Pre-checkpoint bundle gates (per saved memory feedback-pre-checkpoint-
bundle-gates.md): 6/6 GREEN unchanged from Plan 04-03 baseline (zero
production source changes in Plan 04-04).
- SW chunk new Function: 0 (Plan 04-02 polarity preserved)
- SW chunk eval: 0 (preserved)
- SW chunk Buffer.: 1 (pre-existing JSZip polyfill; logged deferred)
- SW chunk window./doc.: 0/0 (preserved)
- dist/ grep × 12 hooks: 0 matches (Tier-1 inventory invariant held)
- Manifest: validates clean
vitest baseline: 183 tests total. Sequential `npm test` showed 180/183 with
3 pre-existing flakes in tests/background/blob-url-download.test.ts +
tests/background/webm-remux.test.ts + tests/offscreen/webm-playback.test.ts;
all 3 PASS in isolation. Per 04-CONTEXT.md items 9-10 these are documented
pre-existing issues (parallel-vitest Tier-1-build-step race + 2 ffprobe/
ffmpeg flakes pre-dating Phase 3) — NOT a Plan 04-04 regression (Plan 04-04
made zero source-code changes that could possibly affect them).
Files committed:
- .planning/phases/04-harden-clean-up-optional/04-04-SUMMARY.md NEW
- .planning/STATE.md: position advanced 4→5 / 7; progress 87% → 90%;
2 decision entries logged; session metadata updated
- .planning/ROADMAP.md: Phase 4 row count 2/7 → 4/7; Plan 04-04
checklist box ticked with full SPIKE FAILED annotation; SC #1 marked
OPEN with empirical evidence inline
Next step (out of Plan 04-04 scope; routed per spike-first contract):
plan-fix ceremony for IndexedDB persistence layer at src/offscreen/*.
The plan-checker/planner owns whether to (a) rewrite Plan 04-04 in-place,
(b) insert a new plan slot (e.g., 04-08), or (c) close Plan 04-04 as
spike-findings + open a fresh follow-up plan. Recommendation in SUMMARY:
option (b) or (c) — keep Plan 04-04 as the canonical spike-findings record.
2026-05-21 20:02:42 +02:00
303644f8cc
docs(04-03): complete harden-clean-up-optional plan 04-03 — A29 flake fix
...
A29 (rrweb DOM verification) rewritten in-place via the canonical cs-
injection-world pattern + strict-sentinel filter. Closes ~2/3 flake
documented in Plans 03-02 + 03-03 SUMMARYs (A29 was "passing" by
reading iana.org leftover DOM events from A27/A28's still-open probe
tabs; a real rrweb regression at src/content/index.ts:284 would have
been masked).
Plan 04-03 task commits (atomic; sequential foreground mode):
- 73eb9b6 : Task 1 — A29 page-side cs-injection-world skeleton +
sentinel-bearing <div> injection
- b341a71 : Task 2 — A29 host-side strict-sentinel filter (RESEARCH Q3
Code Example Pattern 3); IncrementalSource added to @rrweb/types
import binding; A29.2 PASS × 5/5 consecutive UAT runs
Empirical evidence:
- vitest 183/183 GREEN preserved (Plan 04-02 baseline)
- UAT harness 33/33 GREEN × 5 consecutive runs
- A29 strict-sentinel: mutationEvents=1, sentinelEvents=1 in ALL 5 runs
- Tier-1 FORBIDDEN_HOOK_STRINGS unchanged at 12
- SW chunk: 0 new Function, 0 eval (Plan 04-02 baseline held)
- Pre-checkpoint bundle gates 5/5 PASS
STATE.md + ROADMAP.md updated per sequential workflow:
- Plan counter advanced 3 → 4 of 7
- Progress 83% → 87% (26/30 plans complete)
- Decision log entry added for Plan 04-03
- ROADMAP Phase 4 04-03 row flipped to [x]
2026-05-21 17:01:58 +02:00
6a1fc32826
docs(04-02): complete harden-clean-up-optional plan 04-02 — build hygiene
...
Plan 04-02 closes three independent build-hygiene fixes consolidated into
one plan because they share the build-gate-grep test-scaffold pattern:
1. **setimmediate polyfill replacement** — layered 4-mechanism CSP-hardening
eliminates the `new Function` literal from the SW chunk (grep -c flips
1→0 across all three SW chunks). Runtime guard + nodePolyfills exclude
+ resolve.alias + Rollup post-transform plugin. Option α (force JSZip
unbundled lib/index.js) attempted + reverted because it broke
readable-stream-browser propagation causing UAT A30+ regressions;
Option β (post-transform plugin) preserves JSZip's pre-bundled
distribution verbatim while excising the offending literal.
2. **ROADMAP SC #3** (generate-icons ESM/CJS) — `git mv generate-icons.js
generate-icons.cjs` resolves the `require('fs')` under
`package.json type: module` via Node's `.cjs`-as-CJS rule.
3. **ROADMAP SC #4** (dead-code grep) — `tests/build/dead-code-grep.test.ts`
regression-pins `permissions.request` absence in `src/`.
Plus closure of Plan 01-12 Wave 7's setimmediate deferred-items entry.
Task commits:
- 630d40c test(04-02): Wave 0 RED — no-new-function + dead-code-grep
- f251297 feat(04-02): Wave 1 GREEN — setimmediate replacement + CJS rename + closure
Verification:
- vitest 180/180 → 183/183 GREEN on clean run (+3 net new tests)
- UAT harness 33/33 GREEN preserved (REVISION iter-2 WARNING 1 empirical pin)
- Pre-checkpoint bundle gates 5/5 PASS; SW CSP-safety polarity flipped 1→0
- tsc-clean preserved; npm run build exit 0; node generate-icons.cjs exit 0
STATE.md: Plan 3/7 (Plan 04-02 complete); 25/30 total plans; 83% progress.
ROADMAP.md: Phase 4 progress 2/7 plans complete (04-01 + 04-02).
deferred-items.md: Plan 01-12 Wave 7 setimmediate entry CLOSED end-to-end.
SUMMARY at `.planning/phases/04-harden-clean-up-optional/04-02-SUMMARY.md`.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-21 15:41:54 +02:00
f72bca5c46
docs(04-01): complete audit-p1-polish-content-script plan
...
Plan 04-01 closure marker — 04-01-SUMMARY.md + STATE.md position advance
(Plan 1 of 7 -> Plan 2 of 7; Plan 04-02 build hygiene queued NEXT in Wave 1)
+ ROADMAP plan-progress table flip ([ ] -> [x] 04-01-PLAN.md row).
Plan delivered (per SUMMARY):
- Audit P1 #11 fetch URL extraction fix (TWO sites; instanceof Request narrow)
- Audit P1 #14 navigation URL tracking fix (module-level previousUrl)
- Audit P1 #15 rrweb emit timestamp normalization (Date.now() Unix epoch)
- 9 new vitest tests under tests/content/; baseline 171 -> 180/180 GREEN
- tsc-clean preserved; Tier-1 hook-strings inventory unchanged at 12
- Audit P1 polish backlog CLOSED 3/3
Per-task commits (TDD pair):
- 3dbc51c test(04-01): Wave 0 RED — content-script test scaffolds
- 7da30af feat(04-01): Wave 1 GREEN — 3 surgical edits in src/content/index.ts
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-21 14:34:03 +02:00
9ad5069f70
docs(state): mark phase 04 executing — begin-phase tick
...
Set status=executing, current focus=Phase 04, position=Plan 1 of 7.
2026-05-21 13:32:53 +02:00
3ceca875e5
docs(state): resume-work — HANDOFF.json consumed; user routed to /gsd-execute-phase 4
...
Session continuity updated; .continue-here.md preserved as secondary fallback.
2026-05-21 10:31:20 +02:00
55369b80ad
docs(state): record phase 4 plan-phase closure — iter-2 PASSED + 3 cosmetic advisories fixed
...
state.record-session CLI bug recurred (status: completed because 23/30 partial
match triggered; restored: status=ready_to_execute). total_plans correctly
bumped 23 → 30 (Phase 1: 14 + Phase 2: 4 + Phase 3: 5 + Phase 4: 7).
Phase 4 plan-phase ceremony complete:
- 7 plans across 6 waves (Wave 1: 04-01+04-02 parallel; Waves 2-6 single-plan)
- Plan-checker iter-1: 2 BLOCKER + 4 WARNING (fixed)
- Plan-checker iter-2: VERIFICATION PASSED with 3 cosmetic advisories
- 3 cosmetic advisories now fixed (commit 3c1280e ):
* Dim 11 RESEARCH.md Open Questions (RESOLVED) suffix
* Dim 12 PATTERNS.md:886 DEPRECATED banner citing Plan 04-04 Option B
* VALIDATION.md frontmatter revision count 4 → 5
Phase 4 ready for execution: 7 plans (~30 anticipated files; 7 new test files;
A33+A34 harness extensions; setimmediate polyfill replacement; dead-code grep;
SW state persistence spike+impl; dark-logo currentColor; cursor verification
+ stale-note correction; closure aggregator + ROADMAP backfill).
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-21 10:21:44 +02:00
61caf04273
docs(state): record phase 4 UI-SPEC session — APPROVED 5/6 + 1 FLAG non-blocking
...
state.record-session CLI bug recurred (status: completed because 23/23 known
plans done). Restored: status=ready_to_plan.
UI-SPEC.md at:
.planning/phases/04-harden-clean-up-optional/04-UI-SPEC.md
status: approved · reviewer: gsd-ui-checker · reviewed_at: 2026-05-20
Verdict: 5/6 dimensions PASS + 1 FLAG (Dim 4 inherited type scale exceeds
standard thresholds but is locked from Phase 1 operator brand-fit ack
2026-05-20; Phase 4 adds zero new sizes/weights) — non-blocking.
Next: /gsd-plan-phase 4 (preferences preserved at .plan-phase-preferences.md
auto-deletes when consumed).
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-21 07:47:10 +02:00
f14c605dcd
docs(state): record phase 4 context session — Phase 4 discuss-phase complete
...
state.record-session CLI bug recurred (status flipped completed because
23/23 known plans done). Restored: status=ready_to_plan.
Phase 4 CONTEXT.md at:
.planning/phases/04-harden-clean-up-optional/04-CONTEXT.md
5 D-P4-* decisions locked:
- D-P4-01 Full Phase 4 scope (all 4 ROADMAP SC + ~10 of 12 deferred items;
excludes rrweb v2 + programmatic SW-RAM)
- D-P4-02 Audit P1 all three (#11 fetch + #14 nav URL + #15 rrweb timestamps)
- D-P4-03 Both visual polish items (cursor visibility + dark-logo)
- D-P4-04 Alpha tester integration user-handled out-of-band (proceed independently)
- D-P4-05 ROADMAP backfill in scope (docs hygiene)
Next: /gsd-plan-phase 4 (note: UI-SPEC gate may trip on dark-logo work;
suggest --skip-ui or generate thin UI-SPEC for visual polish surface).
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-20 22:17:59 +02:00
d02b41b7c7
docs(phase-03): VERIFICATION + Phase 3 closure markers — verdict PASSED (5/5 ROADMAP + 9/9 SPEC §10)
...
Phase 3 verifier returned human_needed with 2 verification items:
1. §10 #9 RAM ceiling — genuinely non-automatable (Page.metrics page-realm only
per RESEARCH Pitfall 2; SW heap unreachable in MV3 without research budget)
2. ROADMAP/STATE marker flips — orchestrator-owned per worktree protocol
Item 2 resolved automatically via gsd-sdk phase.complete:
- ROADMAP Phase 3 marker flipped [x]
- STATE.md completed_phases: 2 → 3; percent recalculated 75
- REQUIREMENTS.md REQ-rrweb-dom-buffer + REQ-user-event-log flipped Complete
Item 1 OVERRIDDEN to VERIFIED based on user explicit ack 2026-05-20:
- A32 best-effort scaffolding (page-realm Page.metrics with explicit "page-realm
only" diagnostic; ~1.82 MB at harness baseline; harness self-leak detector)
- chrome://memory-internals operator instructions preserved in human_verification
for spot-checks
- Alpha distribution build covers real-world cross-profile RAM observation
- D-P3-04 charter explicitly authorized best-effort + operator/alpha path
- Analogous to Phase 2 T5 override per saved memory
feedback-trust-harness-over-manual-uat.md
- Programmatic SW-context measurement via chrome.devtools Memory API deferred
to Phase 4 hardening (in 03-VERIFICATION.md Forward-Looking Deferred Items)
VERIFICATION.md frontmatter: status flipped human_needed → passed.
overrides_applied: 4 (3 from executor 03-05 + 1 for §10 #9 closure).
STATE.md body refreshed: Phase 3 marked COMPLETE with citations + Phase 4
character clarified (optional; milestone v1 may close at Phase 3); body
completed_plans bumped 18 → 23 (CLI bug auto-fix; 14 + 4 + 5 = 23).
PROJECT.md Validated section evolved: Phase 3 section added with REQ-rrweb-dom-buffer
+ REQ-user-event-log + §10 sweep entries; Active section restructured to show
Phase 4 backlog (12 deferred items) with milestone v1 close option called out.
Phase 3 closure: 5/5 plans landed; UAT harness 29→33 GREEN (A29 A30 A31 A32);
vitest 171/171 GREEN preserved; Tier-1 FORBIDDEN_HOOK_STRINGS 12; bundle gates
6/6 PASS; src/content/index.ts UNMODIFIED per D-P3-02 charter literal.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-20 21:36:06 +02:00
5892371eae
chore(03): state.begin-phase — mark Phase 3 executing
...
- Status: ready_to_execute → Executing Phase 03
- Current focus → Phase 03 (spec-10-smoke-verification-dom-event-log-verification)
- Current Position → Phase: 03 / Plan: 1 of 5
- Branch created: gsd/phase-03-spec-10-smoke-verification-dom-event-log-verification
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-20 19:07:34 +02:00
de3f14722f
docs(03): plan-phase closure — checker WARNING resolved + preferences consumed + state synced
...
Plan-checker iter-1 VERIFICATION PASSED with 1 cosmetic WARNING (Dimension 11
Research Resolution: Open Questions section heading lacked (RESOLVED) suffix
convention). Fixed inline: heading now reads "## Open Questions (RESOLVED)".
.plan-phase-preferences.md (created mid-/gsd-plan-phase first invocation to
preserve gate answers across the UI-SPEC detour) DELETED — purpose served;
this plan-phase invocation honored the saved research-first-light scope
brief.
state.record-session CLI bug recurred (status flipped to "completed" because
18/23 known plans done). Restored: status=ready_to_execute. percent: 78 is
correct now (5 Phase 3 plans counted; was 18/18=100 stale).
Phase 3 ready for execution: 5 plans validated, infrastructure inherited,
test baselines preserved.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-20 19:06:00 +02:00
0d2bc74dae
docs(state): record phase 3 UI-SPEC session — null-spec approved 6/6 dimensions
...
state.record-session CLI bug (same as previous turn): flipped status:completed
+ percent:100 since 18/18 currently-known plans are done. Restored:
status:ready_to_plan, percent:50 (2/4 phases truly complete).
UI-SPEC.md at:
.planning/phases/03-spec-10-smoke-verification-dom-event-log-verification/03-UI-SPEC.md
Verifier APPROVED with 6/6 dimensions PASS (null-spec correctly applied —
inherited Phase 1 design system locked read-only; probe-page conventions
scoped to internal Puppeteer fixtures).
Next: /gsd-plan-phase 3 (preferences preserved at .plan-phase-preferences.md
auto-deletes when consumed).
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-20 18:06:09 +02:00
2b4f0689fb
docs(state): record phase 3 context session — Phase 3 discuss-phase complete
...
state.record-session CLI incorrectly flipped status to "completed" + percent to
100% (since 18/18 currently-known plans are done — but that's a CLI inference
bug; Phase 3 + Phase 4 are still pending so milestone is NOT complete).
Restored: status=ready_to_plan, percent=50% (2/4 phases truly complete).
Phase 3 CONTEXT.md at:
.planning/phases/03-spec-10-smoke-verification-dom-event-log-verification/03-CONTEXT.md
DISCUSSION-LOG.md sibling captures the alternatives considered.
5 plans + 4 D-P3-* locked decisions ready for /gsd-plan-phase 3.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-20 17:57:07 +02:00
a8b4fe567b
docs(phase-02): complete phase execution — markers flipped to closed
...
Phase 2 closure tracking:
- STATE.md: status: ready_to_plan (Phase 3 prep awaits); Current Position
flipped Phase 2 → COMPLETE; progress 14/18 → 18/18; percent 50% reflects
2/4 phases complete
- ROADMAP.md: Phase 2 plan-count + status updated by gsd-sdk phase.complete
- REQUIREMENTS.md: 5 Phase 2 REQs flipped to Complete with Phase 2 closure
notes:
* REQ-screenshot-on-export — A28 archive layout verification
* REQ-popup-ui — SAVE-only state machine verified by A24 + A25
* REQ-archive-layout — A28 set-equality on jszip-parsed archive
* REQ-meta-json-schema — D-P2-02 + D-P2-03 8-field shape verified by
A26 + A27 + tests/build/strict-meta-json-validation.test.ts (8 tests)
+ tests/background/meta-json-urls-schema.test.ts (5 tests)
* REQ-archive-export-latency — D-P2-01 Blob URL pipeline closes audit
P0-6; A25 empirical <5s verification
- REQ-manifest-permissions: amended to reflect DEC-011 Amendment 1 (added
`tabs` permission for Phase 2 D-P2-02 meta.urls feature) + corrected
`tabCapture` → `desktopCapture` per D-01 historical evolution
Phase 2 outcome: 4/4 plans landed; UAT harness 24→29 GREEN; vitest 153→171
GREEN; bundle gates 6/6 PASS; verifier verdict PASSED (5/5; T5 override
per user delegation + saved memory feedback-trust-harness-over-manual-uat.md).
Audit closures: P0-6 (base64 data-URL cap → Blob URL pipeline) + P1 #10
(meta.url:string → urls:string[] schema).
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-20 17:43:51 +02:00
44ea925e6f
chore(02): state.begin-phase — mark Phase 2 executing
...
- Status: executing → Executing Phase 02
- Current focus → Phase 02 (stabilize-export-pipeline)
- Current Position → Phase: 02 / Plan: 1 of 4
- Last activity → 2026-05-20 — Phase 02 execution started
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-20 15:09:54 +02:00
6f052c74f8
chore(02): resume — consume HANDOFF + sync STATE for Phase 2 execution
...
- Delete HANDOFF.json (one-shot artifact; resume succeeded)
- Update STATE.md Current Position to reflect re-phased structure (Phase 1 of 4 closed; Phase 2 planning complete)
- Update Session Continuity with current resume context
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-20 15:08:59 +02:00
cc042a5583
docs(02): capture phase context — discuss-phase complete
...
Phase 2 (Stabilize export pipeline) discuss-phase landed via inline canonical
workflow execution. 02-CONTEXT.md captures 3 locked decisions:
- **D-P2-01:** Offscreen-minted Blob URL pipeline replaces base64 data: URL
download path (src/background/index.ts:709-710). SW Blob → offscreen
URL.createObjectURL → SW chrome.downloads.download → URL.revokeObjectURL on
onChanged. Closes audit P0-6. Unblocks real-archive size (>2 MB).
- **D-P2-02:** meta.json schema migrates singular `url: string` to plural
`urls: string[]` capturing all tabs visible during the 30s recording window.
Schema-breaking change requires REQUIREMENTS.md REQ-meta-json-schema
amendment + SessionMetadata type update. Closes audit P1 #10 captured-URL bug.
- **D-P2-03:** Full Phase 2 scope = Blob URL migration + meta.urls schema
migration + strict meta.json schema validation test + UAT harness A24+
<5s latency assertion. ~3-4 plans expected.
Decision provenance:
- D-P2-01 rationale: user "up to you. If you think we need to migrate — good
let's do it." Plus analysis: real archives EXCEED base64 cap.
- D-P2-02 rationale: user picked "All tabs' URLs as an array
(meta.json.urls)" — highest informational fidelity for multi-tab bug
reproduction. Privacy acceptable per "log is internal" v1 charter.
- D-P2-03 rationale: user picked "Full scope: bug fixes + schema + harness
latency assertion".
Canonical references + code context + deferred items captured in CONTEXT.md.
Phase boundary explicit: not from-scratch; closes residual gaps after Plans
01-08/01-09/01-10/01-12 substantively shipped REQ-popup-ui + REQ-archive-
layout + REQ-screenshot-on-export.
Next: /gsd-plan-phase 2.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-20 13:41:08 +02:00
6dbed91efd
docs(roadmap): re-phase milestone — remove Phase 2 (DOM/event-capture privacy)
...
Per operator charter shift 2026-05-20: "we don't care about privacy hardening.
At least here." Archive flow is internal-only (no external transmission),
which reframes the password-masking P0-5 defect from privacy-regulation
gravity to operator-hygiene polish.
Re-phasing applied across 4 planning artifacts:
ROADMAP.md:
- Original Phase 2 ("Stabilize DOM + event-capture privacy") REMOVED entirely
(summary list + Phase Details section + Progress table row).
- DOM + event-log VERIFICATION (REQ-rrweb-dom-buffer + REQ-user-event-log)
ABSORBED by new Phase 3 (SPEC §10 smoke verification).
- Phase numbering: old 3 → new 2 (export), old 4 → new 3 (smoke), old 5 → new 4
(optional harden). Dependency chains updated accordingly.
- Overview blurb + journey narrative + success criteria refreshed.
- Phase 3 (smoke) explicitly NOT-in-scope: P0-5 password masking dropped.
REQUIREMENTS.md traceability:
- REQ-rrweb-dom-buffer: Phase 2 → Phase 3 (verification scope; UAT harness
A24+ extension planned).
- REQ-user-event-log: Phase 2 → Phase 3 (same context).
- REQ-password-confidentiality: Phase 2 → Out of Scope (v1) — DEFERRED per
charter shift.
- REQ-popup-ui, REQ-screenshot-on-export, REQ-archive-layout,
REQ-meta-json-schema, REQ-archive-export-latency: Phase 3 → Phase 2
(renumbered; substantively shipped via Plans 01-08 + 01-09 + 01-12;
residual gaps in Phase 2).
- Coverage: 10 mapped + 1 out-of-scope (was 11 mapped).
PROJECT.md:
- CON-sensitive-data-masking: DEFERRED 2026-05-20 (preserves audit trail
via strikethrough; rationale documented).
- DEC-004 amendment: rrweb 5000-event cap retained; masking deferred. Cites
rrweb 2.0.0-alpha.4 maskInputSelector→maskInputFn API change.
STATE.md:
- frontmatter total_phases: 5 → 4.
- stopped_at narrative captures the re-phasing event.
CLI bug note: this re-phasing was attempted via `gsd-sdk query phase.remove 2`
+ canonical `/gsd-remove-phase 2` Skill invocation, but BOTH paths produced
corrupted output (cascading rename via reverse-iteration loop at
phase.cjs:670-679 collapsed all subsequent phases to "Phase 2", plus a
mysterious "2026"→"2002" date corruption). Recovery applied as manual edits
in this commit. CLI bug logged as upstream GSD-framework concern; not a
Mokosh-side issue.
Plan: next is `/gsd-discuss-phase 2` (new Phase 2 = export pipeline; narrowed
scope per re-phasing — ~2-3 plans expected since Plans 01-08 + 01-09 + 01-10
+ 01-12 already shipped most surface).
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-20 13:25:11 +02:00
586836f8a0
docs(01): VERIFICATION + Phase 1 closure markers — goal-backward audit GREEN
...
gsd-verifier goal-backward audit (2026-05-20) returned GREEN verdict on
Phase 1 (Stabilize Video Pipeline + whole-desktop capture + as-automatic-
as-platform-allows recording start):
- 17/17 must-haves verified: 11 REQs/charters + 6 cross-cutting gates
- 14/14 plans complete (01-01..01-09 + 01-11 spike-pivot + 01-12 + 01-13
+ 01-14 + 01-10)
- 5 operator empirical acks: Plan 01-07 (Chrome playback 2026-05-15) +
Plan 01-13 (harness 2026-05-19) + Plan 01-12 (brand-fit 2026-05-20) +
Plan 01-10 cycle-2 ("All good" 2026-05-20) + Plan 01-10 brand-rename
follow-up (2026-05-20)
- Test gates: vitest 153/153 GREEN; UAT harness 24/24 GREEN; Tier-1 grep
gate 12 FORBIDDEN_HOOK_STRINGS; pre-checkpoint bundle gates PASS
- 7 P0 audit defects: 6 closed in-Phase-1-scope; P0 #6 (data-sensitive
masking) properly deferred to Phase 2
Marker flips landed:
- STATE.md status reflects Phase 1 COMPLETE; completed_phases 0 → 1
- ROADMAP.md Phase 1 row [ ] → [x] with closure-arc summary
- REQUIREMENTS.md REQ-video-ring-buffer In-progress → Complete 2026-05-20
- VERIFICATION.md committed (orchestrator-bundle pattern per verifier
protocol)
Forward-looking deferred (NOT gaps):
- Phase 2: REQ-rrweb-dom-buffer + REQ-user-event-log +
REQ-password-confidentiality (audit P0 #6 )
- Phase 5 hardening: getDisplayMedia cursor visibility; setimmediate
polyfill new Function pre-existing; tabs permission gap; dark-surface
logo contrast; 2 ffprobe/ffmpeg test flakes
Phase 2 (Stabilize DOM + event-capture privacy) kickoff pending.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-20 12:31:36 +02:00
d1ef77a7d1
docs(01-10): state + roadmap + requirements — Plan 01-10 closure
...
State markers sync after Plan 01-10 closure:
STATE.md:
- progress.completed_plans: 13 → 14
- progress.percent: 93 → 100 (all 14 Phase 1 functional plans complete)
- status: executing (Phase 1 final-closure marker flip pending)
- stopped_at + Last session timestamps refreshed
- Current Position bumped to 14/14 plans complete
- Outstanding Phase 1 gates: Plan 01-10 row marked CLOSED;
Phase 1 final-closure marker flip listed as remaining work
- Plan 01-10 closure section added mirroring existing 01-12/01-13/01-14
patterns: 4 wave commits + 5 inter-cycle debug commits + cycle-2 ack
- Performance Metrics: Phase 01 P10 row added (5h, 5 tasks, 14 files)
- Decisions: 3 Plan 01-10 architectural decisions added
(first-install activation; D-16-toolbar charter preservation;
three-pipeline DOM population pattern; startVideoCapture D-01
cleanup gap closure)
ROADMAP.md:
- Plan 01-10 row flipped to [x] with full closure annotations
(commit chain + harness counts + operator ack date)
- Plan 01-09 row annotated with closure-cycle follow-up debug
commits (a2dfc8c startVideoCapture no-tab + 4bba679 notifStartup
text split — both landed during Plan 01-10 closure cycle)
- Phase 1 plans-count narrative updated: "all 14 functional plans
complete; Phase 1 final-closure marker flip pending"
- Progress table: Phase 1 plans complete 13/14 → 14/14;
status row updated to "Final-closure marker flip pending"
REQUIREMENTS.md:
- Footer timestamp + closure note updated: Plan 01-10 introduced
no new functional REQs (it consumed REQ-video-ring-buffer
already-Complete via Plan 01-07) by adding the first-install
operator-facing activation surface that complements the always-on
capture pipeline.
- Phase 1 final functional plan delivered; final-closure marker
flip pending (REQUIREMENTS / ROADMAP / STATE markers + optional
/gsd-verify-work 1).
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-20 12:10:56 +02:00
66e6f503a4
docs(01-12): state + roadmap + requirements — Plan 01-12 closure
...
Plan 01-12 closure documentation sync per the plan's Wave 7 Task 1
spec. Three docs land together as one atomic closure commit per the
Plan 01-13 + 01-14 closure cadence convention.
STATE.md changes:
- status: verifying → executing (Plan 01-10 welcome tab still pending)
- stopped_at: Plan 01-14 → Plan 01-12 closed via Wave 7 brand-fit
ack 2026-05-20 'all good'; Plan 01-10 remains as final Phase 1
functional plan
- last_updated + last_activity: 2026-05-19 → 2026-05-20
- progress.completed_plans: 12 → 13 (13 plans: 01-01..01-09 + 01-11
spike + 01-12 + 01-13 + 01-14; Plan 01-10 pending)
- progress.percent: 86 → 93
- "Plan 01-13 closure" header annotated: brand/design ack subsequently
closed via Plan 01-12 Wave 7 2026-05-20
- New "Plan 01-12 closure (2026-05-20)" section: 7-wave execution arc
with all 10 commit hashes (3fe018b plan-baseline-revision → 34a9ce1
Wave 0 → f86fd60 + abab6e1 Wave 1 → 7732a30 Wave 2 → 110cebc Wave 3
→ 468f16d Wave 4 → e8d2881 Wave 5 → b909c37 Wave 6 + 865d394
pre-checkpoint + f319c7d SUMMARY); R2 Lora substitution; 16 i18n
keys; branded icons; BADGE_REC_COLOR #b2543d; chrome.i18n fallback;
A18-A22 harness; pre-checkpoint bundle gates per
feedback-pre-checkpoint-bundle-gates.md; setimmediate polyfill
discovery logged to deferred-items.md (Phase 5 hardening); operator
brand-fit ack; Plan 01-13 Task 9 functional closure
- "Outstanding Phase 1 gates" updated: Plan 01-13 Task 9 + Plan 01-12
CLOSED; only Plan 01-10 remains
- Performance Metrics table: Plan 01-12 entry appended (~10h
cumulative; 10 tasks; ~50+ files)
- Decisions section: 2 new entries for Plan 01-12 design integration
+ Plan 01-13 Task 9 closure linkage
- Session Continuity: last/prior session updated to 2026-05-20 /
2026-05-19
ROADMAP.md changes:
- Phase 1 Plans list: 01-12-PLAN.md entry flipped from [ ] to [x]
with full closure annotation (R2 Lora self-host, tokens.css
canonical, 16 i18n keys across en+ru, branded Loom icons, manifest
i18n, BADGE_REC_COLOR madder #b2543d, chrome.i18n fallback,
harness A18-A22, operator brand-fit ack 2026-05-20 'all good')
- Phase 1 plan count: 13 → 14 plans (01-01 through 01-14)
- Progress table Phase 1 row: 7/7 Complete → 13/14 Executing with
closure-status disambiguation (functional via Plan 01-13;
design/brand via Plan 01-12; Plan 01-10 welcome tab remains)
REQUIREMENTS.md changes:
- REQ-install-clean: [ ] Pending → [x] Complete (2026-05-20)
with annotation: fresh build clean; zero remote-font CSP errors;
branded icons; en+ru manifest:name resolution; operator brand-fit
ack
- REQ-manifest-permissions: [ ] Pending → [x] Complete (2026-05-20)
with annotation: manifest:name + :description +
:action.default_title migrated to __MSG_*__ + default_locale='en';
manifest validation PASS; en↔ru parity; permissions DEC-011
baseline UNCHANGED
- Traceability table: both requirements moved from Phase 3/4 Pending
to "Phase 1 closure via Plan 01-12" Complete
- Footer: last-updated 2026-05-15 → 2026-05-20 with annotation
noting the requirements flipped at Plan 01-12 closure
No code changes; pure documentation closure sync.
Closure commit hashes:
- SUMMARY: f319c7d (.planning/phases/01-stabilize-video-pipeline/01-12-SUMMARY.md)
- State sync: this commit (.planning/STATE.md + .planning/ROADMAP.md
+ .planning/REQUIREMENTS.md)
Phase 1 status post-closure:
- Functional contract: CLOSED via Plan 01-13 harness PASS (2026-05-19)
- Design/brand contract: CLOSED via Plan 01-12 brand-fit ack
(2026-05-20)
- Remaining: Plan 01-10 (welcome tab) — operator-facing onboarding
surface; canonical src/shared/tokens.css from Plan 01-12 now
available for swap-in
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-20 08:33:52 +02:00
9792c0f6c3
docs(01-14): state + roadmap + requirements — Plan 01-14 closure
...
- STATE.md: advance plan counter, update progress (12/14 = 86%), record
metric (Plan 01-14: 49m, 1 task, 7 files), add decision, record session.
- ROADMAP.md: update phase-01 progress table (plan_count=14, summary_count=12).
- REQUIREMENTS.md: mark REQ-video-ring-buffer complete (final closure for
the Phase-01 video-pipeline charter).
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-19 21:41:26 +02:00
4d828f1080
docs(01-10): install-flow + auto-select research — both asks INFEASIBLE
...
Researcher (gsd-phase-researcher) returned HIGH-confidence verdicts on the
12-area brief from .continue-here.md:
Ask 1 (install-time auto-start): INFEASIBLE in unmanaged Chrome.
W3C Screen Capture spec §5.1 mandates transient user activation;
chrome.runtime.onInstalled confers none. Floor: 2 clicks
(toolbar/welcome-page → Share button on picker). Enterprise policy
ScreenCaptureWithoutGestureAllowedForOrigins exists (Chrome+Edge ≥ 123)
but only applies to managed-Chrome contexts with extension URL
whitelisted — does NOT apply to Load-Unpacked deployment; deferred-idea.
Ask 2 (auto-select desktop / skip picker): INFEASIBLE in unmanaged Chrome.
W3C spec mandates user MUST choose every time. displaySurface:'monitor'
is a hint (already applied src/offscreen/recorder.ts:270).
chooseDesktopMedia doesn't auto-accept on single-monitor setups AND
streamId not usable in MV3 offscreen documents (Chrome DevRel position).
Primary recommendation: KEEP Plan 01-10's current informational CTA
charter (commit 3a530c2 unchanged). Both architectures hit the same
2-click floor; informational CTA has lower maintenance surface AND
teaches operator where the toolbar icon lives (critical for day-2+
sessions).
Enhancement candidate (NOT required for 01-10): add
monitorTypeSurfaces:'include' (Chrome ≥ 119) to offscreen getDisplayMedia
constraints — single line, zero risk, removes tab/window panes from
picker entirely. Suggest as Plan 01-09 amendment OR mini-plan.
Open questions for orchestrator (3):
1. Confirm informational CTA charter (this research recommends YES)
2. Ship monitorTypeSurfaces:'include' as Plan 01-09 amendment vs deferred?
3. Are Repremium operators on Wayland Linux? (affects welcome-page copy)
File: .planning/phases/01-stabilize-video-pipeline/01-10-RESEARCH.md
(1092 lines; full W3C citations, Chromium issue links, prior art for
Loom/Screencastify/Veed/Awesome-Screenshot, ASCII flow diagrams,
edge-case enumeration for macOS/Wayland/incognito/managed-Chrome)
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-19 20:12:18 +02:00
6a29ae4124
chore(01): resume work — consume HANDOFF.json + ignore dist-archives
...
- Delete .planning/HANDOFF.json (one-shot artifact per resume-project workflow)
- Add dist-archives/ to .gitignore (from prior session's distribution-zip build)
- Bump STATE.md Session Continuity to reflect resumed session + next action
(install-flow + auto-select researcher spawn)
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-19 18:47:52 +02:00
e035fd279d
docs(01-09): Amendment 3 + 01-13 SUMMARY reversal note + STATE.md sync + debug records
...
Plan 01-09 Amendment 3 (2026-05-19) — atomic documentation pass for
the save-does-not-stop-recording charter reversal.
Changes:
- .planning/phases/01-stabilize-video-pipeline/01-09-PLAN.md:
Amendment 3 block added above <success_criteria> (mirrors
Amendment 2 placement). Describes the reversed charter,
references the new debug record, points at the inverted
test file + harness A14.
- .planning/phases/01-stabilize-video-pipeline/01-13-SUMMARY.md:
"Subsequent Reversal (2026-05-19)" footer added. Notes that
npm run test:uat still 15/15 GREEN under the inverted A14
contract; vitest baseline preserved at 98 GREEN.
- .planning/STATE.md:
Plan 01-13 closure block extended with CHARTER REVERSAL bullet
citing the 4 commit SHAs (6ac23fd RED, 7645765 GREEN,
1baaf45 A14 invert, this commit docs).
- .planning/debug/resolved/01-09-save-stops-recording.md:
SUPERSEDED 2026-05-19 footer appended (audit trail; original
fix was technically correct against its charter, reversal is
UX iteration not technical defect).
- .planning/debug/resolved/01-09-save-does-not-stop-recording.md:
NEW debug record landed directly in resolved/ (no checkpoint
cycle — orchestrator-diagnosed reversal). Documents symptom,
charter clarification cycle, fix shape, RED→GREEN evidence
with commit SHAs + vitest/harness output, anti-regression
coverage at unit + E2E layers.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-19 17:50:49 +02:00
285e46f620
docs(01-13): close — operator UAT ack 2026-05-19 + save-stops debug resolved + SUMMARY landed
...
Plan 01-13 fully closed. Operator UAT acked "all good" on 2026-05-19;
recovery flow (A7) + restart-after-click (A2) both harness-covered, no
manual verification needed.
What this commit lands:
- 01-13-SUMMARY.md (full spike-pivot-then-implementation narrative; tracks
all 16 commits across Plan 01-11 spike + Plan 01-13 4-wave execution +
save-stops debug session; documents 15/15 npm run test:uat GREEN +
98/98 vitest GREEN + Bug A/B regression-rewind demos verified)
- Save-stops debug record moved to .planning/debug/resolved/ (closure-
canonical location; prior inline path tracked via git mv)
- STATE.md sync: completed_plans 11→12, percent 95→96, Plan 01-13
fully-closed narrative + save-stops debug session captured
Phase 1 functional contract: CLOSED via harness PASS.
Remaining Phase 1 gates: Plan 01-10 (welcome tab) + Plan 01-12 (design
integration; pending designer Newsreader-Cyrillic reply).
Phase 2 inherits the harness as its closure-gate template.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-19 13:46:49 +02:00
9c5ff8b2a7
docs(01-13): wave-4 task-8 — Plan 01-09 closure-via-harness amendment + STATE.md sync
...
Lands the Wave 4 closure docs:
- 01-09-PLAN.md Amendment 2: harness PASS (npm run test:uat 14/14 GREEN at d793c9e )
now closes Plan 01-09 functional contract (original Task 5 steps 4, 5, 7-13, 15);
operator retains only step 1 (build) + step 14 (brand/design ack — Plan 01-13
Task 9 charter). Coverage map table pins each retired manual step to its
corresponding harness assertion (A1-A13).
- STATE.md sync: completed_plans 9->11, percent 92->~95, last_updated
2026-05-19T10:40:00Z; Current Position narrative replaced with Plan 01-13
landing summary + outstanding Phase 1 gates (Plan 01-13 Task 9 operator
checkpoint, Plan 01-10 welcome tab, Plan 01-12 design integration awaiting
designer reply).
Verification (post-edit, docs-only — no src/ touched):
- npm run test:uat: 14/14 GREEN at d793c9e baseline preserved
- npx vitest: 94/94 (the no-test-hooks-in-prod-bundle.test.ts default 5s timeout
flake is harness-side, not introduced by this commit; re-run with
--testTimeout=60000 passes)
- git status post-commit: clean
Followup: ROADMAP.md is missing entries for Plans 01-08 through 01-12 (these were
all added mid-phase across multiple sessions and the roadmap was never amended;
the Phase-1 Plans block lines 74-80 stops at 01-07 and the progress table line
238 shows the stale '7/7 Complete' count). Backfilling those entries is a
separate concern — out of scope for Plan 01-13 closure per plan-checker flag #4
(hold the line; do not inject). STATE.md notes the counter > total mismatch for
visibility.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-19 10:50:13 +02:00
6dca46529b
chore(01-09): resume from pause — sync STATE.md, remove HANDOFF.json
...
HANDOFF.json artifact consumed per /gsd-resume-work workflow
(one-shot resumption pointer). STATE.md synced forward to reflect
true mid-Plan-01-09 state — status flipped planning→executing,
progress 90→92, Current Position now shows Phase 1 REOPENED with
Plan 01-09 Bug B pending and Plan 01-10 Wave 3 pending.
Session continuity records:
- Pause checkpoint commit: ed82fd6
- Bug A icons commit: a881bf0
- Intel docs unlock commit: f768498
- Next: /gsd-debug session for Bug B state-machine routing
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-17 16:30:54 +02:00
bc310d98cf
revert(01): reopen Phase 1 — D-13 multi-EBML-concat is unplayable
...
REQ-video-ring-buffer flipped from [x] back to [ ]. ROADMAP.md Phase 1
row reverted from [x] Closed 2026-05-15 to [ ] reopened 2026-05-16.
STATE.md status flipped phase_complete → phase_reopened with full
historical narrative preserved.
Root cause (confirmed at byte level by gsd-debugger 2026-05-16):
D-13's concat-of-self-contained-WebM-segments architecture produces a
3-EBML-header WebM that standards-compliant Matroska parsers
(mpv, ffmpeg, Chrome HTMLMediaElement) play only as the first segment
(~9.94 s) and silently drop the remaining 2 segments. Confirmed via
operator mpv drag-drop test of BOTH the canonical 2026-05-15 closure
fixture and the 2026-05-16 UAT-produced fixture — both exhibit the
same broken playback.
The 2026-05-15 "operator-confirmed clean Chrome playback" assessment
was insufficient: it verified the file plays without freezing but did
not measure total duration. Phase 1's primary deliverable
(REQ-video-ring-buffer / SPEC §10 #7 ) is therefore NOT satisfied.
Fix path chosen by user: ts-ebml (parse) + webm-muxer (write) to
replace mergeVideoSegments file-concat with real single-EBML remux.
Will land as Plan 01-08 via fresh /gsd-plan-phase ceremony.
RED test landed in tests/offscreen/webm-playback.test.ts (2 new
assertions on container-format-duration + ffmpeg-full-decode-duration).
2 failures, 53 baseline tests still GREEN.
Option C port-lifecycle refactor (debug session
empty-archive-port-race, commits 674c415..f0871c0) DID land cleanly
and is retained — that fix was orthogonal and correctly resolved the
silent-empty-archive symptom that previously masked this deeper bug.
Debug session: .planning/debug/d13-multi-ebml-concat-unplayable.md
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-16 19:47:47 +02:00
75b88c6219
chore(session): consume HANDOFF.json + refresh STATE session continuity after resume
...
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-16 11:07:42 +02:00
7df72aaa60
feat(01-07): close Phase 1 — REQ-video-ring-buffer complete, SPEC §10 #7 satisfied
...
Phase 1 closure 2026-05-15 — both acceptance gates green:
- D-12 ffprobe structural gate: `ffprobe -v error -f matroska -i
tests/fixtures/last_30sec.webm` exit 0 (cd61cbc )
- A3 empirical-playback gate: operator confirmed clean end-to-end Chrome
playback (no ~1 s freeze); ffmpeg `-v warning -i fixture -f null -`
exit 0 with zero decoder errors (only expected muxer DTS-monotonicity
warnings at segment join boundaries — documented D-13 trade-off for
multi-EBML-header WebM concat; Chrome's MSE pipeline handles this
natively, satisfying SPEC §10 #7 )
Changes:
- .planning/REQUIREMENTS.md
* REQ-video-ring-buffer checkbox [ ] -> [x]; description AMENDED to
document the D-13 restart-segments lifecycle replacing D-09..D-11;
SPEC §10 #2 , #3 , #7 noted as green 2026-05-15
* Traceability table row: REQ-video-ring-buffer | Phase 1 | Complete
(was Pending)
- .planning/ROADMAP.md
* Phase 1 list-item flipped [ ] -> [x] with closure date + summary
* Phase 1 Success Criteria 1, 2, 3 individually checked off; criterion 2
re-worded to reflect D-13 segment-cycling (replacing the original
single-continuous-recorder wording from D-09..D-11)
* Plan list: 01-07-PLAN.md flipped [ ] -> [x] with closure note
* Progress table row: 7/7 Complete 2026-05-15 (was 6/7 In Progress)
* Phase 5 P1/P2 list: appended `getDisplayMedia` cursor visibility
constraint (`video: { cursor: 'always' }`) — surfaced as user
observation during Phase 1 smoke 2026-05-15
- .planning/STATE.md
* Frontmatter: status -> phase_complete, completed_phases 0 -> 1,
completed_plans 6 -> 7, percent 86 -> 100; stopped_at + last_activity
rewritten for closure narrative
* Current Position: Phase 1 COMPLETE, next Phase 2 of 5, Plan 7/7
complete, progress bar [██████████] 100% Phase 1
* Performance Metrics: Phase 1 row populated (7 plans, ~50 min); added
Plan 07 row with closure narrative incl. the two debug sessions
* Decisions log: appended [Phase 01-07-closure] decision and
[Phase 01-07-deferred-to-5] note for the cursor-visibility refinement
* Session Continuity: rewritten for closure; resume file points to the
Plan 07 SUMMARY (commit 3)
* Added "Phase 1 Closure Notes" block with ffprobe + ffmpeg gates,
fixture metadata, test counts, criteria green-status, and a process
retro candidate (auto-injection of empirical-acceptance gates when
RESEARCH.md flags HIGH-risk assumptions)
Refs: .planning/debug/resolved/d12-blob-port-transfer-fails.md,
.planning/debug/resolved/webm-playback-freeze.md
2026-05-15 21:58:38 +02:00
872f25d649
docs(fix-a3): resolve webm-playback-freeze debug session, update STATE
...
Closes the second debug session in Phase 1's life (after d12). Both
sessions resolved fast — ~30 min for d12, ~15 min for the RED-test
landing in this one — because the planner had explicitly pre-staged
contingencies (D-12 ffprobe gate + D-13 restart-segments skeleton)
for the assumptions RESEARCH.md flagged HIGH-risk. Neither was a
planning oversight; both were the documented HIGH-risk assumption
activating as expected.
Changes:
- Moved .planning/debug/webm-playback-freeze.md →
.planning/debug/resolved/webm-playback-freeze.md (status:
root-cause-confirmed → resolved).
- Added the Resolution section: root-cause one-liner, applied-fix
description, the 5 files-changed list, the 6 fix-a3 commit hashes,
the in-tree verification matrix, and the explicit operator
next-step (re-run ./smoke.sh, verify Chrome playback +
ffmpeg-clean stderr + the 2 webm-playback.test.ts assertions
flipping GREEN, then Phase 1 closes).
- Updated STATE.md frontmatter `stopped_at`, the Decisions log
with a [Phase 01-07-debug-a3] entry summarising D-13 activation
+ the type renames + the retired old-API surface, and the
Session Continuity block (timestamp, stopped_at narrative,
resume-file pointer).
Phase 1 close is still pending operator regen of
tests/fixtures/last_30sec.webm. REQ-video-ring-buffer must not
be marked complete by this commit — Plan 07's §10 #7 acceptance
criterion owns that and only the in-Chrome playback + ffmpeg-clean
stderr (against a freshly regenerated fixture) can close it.
2026-05-15 21:18:36 +02:00
bf076199b4
docs(fix-d12): resolve debug session and update STATE
...
- Mark .planning/debug/d12-blob-port-transfer-fails.md as
status: resolved; fill in the Resolution section with the
applied fix (5 commit hashes, files changed), verification
output (15/15 tests, tsc clean, vite build green, zero
as-any/ts-ignore in fix-touched files), and inline answers
to the specialist-review questions raised by the planner.
Move the file to .planning/debug/resolved/.
- Update STATE.md frontmatter (stopped_at) + Decisions log
+ Session Continuity to record the D-12 fix landing and
the open Plan 07 ffprobe gate (still requires operator
smoke.sh + ffprobe re-run before Phase 1 can close).
- Land smoke.sh — the operator's D-12 acceptance-gate harness
that surfaced the original failure. Self-contained: dedicated
/tmp/mokosh-smoke-profile, auto-accept desktop-capture picker,
Downloads polling, ffprobe gate, fixture staging.
REQ-video-ring-buffer remains NOT-complete — Plan 07 owns it,
operator must re-run ./smoke.sh to verify the fix end-to-end
in Chrome.
Refs: debug session d12-blob-port-transfer-fails (resolved).
2026-05-15 20:23:29 +02:00
1ebfb42b30
docs(01-06): complete vite.config.ts collapse plan
...
- 01-06-SUMMARY.md: detailed write-up — 226 → 21 lines, Outcome A
reconciliation (dist/src/offscreen/index.html), full dist layout
for Plan 07's smoke test, T-1-NEW-06-01 / T-1-NEW-06-02 grep gates
- STATE.md: completed_plans 5 → 6, percent 71 → 86, current plan
advanced 6 → 7, two new decisions logged, session stopped_at updated
- ROADMAP.md: Phase 1 plan progress row 4/7 → 6/7; 01-06-PLAN.md
checked off
REQ-video-ring-buffer remains unchecked — Plan 07 owns the ffprobe gate.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-15 18:17:43 +02:00
9e236cbc7b
docs(01-05): complete SW shrink + port host plan
...
Plan 05 closes: src/background/index.ts is now a pure coordinator with
zero video-buffer state, T-1-04 mitigations on both onConnect and
onMessage, OFFSCREEN_READY handshake, port-based buffer fetch via
'video-keepalive' port, IDB orphan cleanup on install, and chrome.offscreen.hasDocument()
re-sync on SW respawn (audit P1 #8 ). 9/9 vitest tests still green;
tsc clean; no as any / @ts-ignore.
REQ-video-ring-buffer stays pending — Plan 07's ffprobe gate owns the
final completion marker.
2026-05-15 18:07:07 +02:00
05d00509bf
docs(01-04): complete offscreen port keepalive + OFFSCREEN_READY handshake plan
...
- Add 01-04-SUMMARY.md with TDD RED/GREEN/REFACTOR gate records,
acceptance grep gates, threat mitigations (T-1-04, T-1-NEW-04-01),
Plan 05 SW-side handoff (REQUIRED sender.id === chrome.runtime.id
check), and 1 Rule 1 deviation documented
- Advance STATE.md Plan counter 4 → 5, progress 43% → 57%
- Append 3 decisions to STATE.md Accumulated Context
- Update ROADMAP.md: 01-04-PLAN checkbox → [x], phase progress row 3/7 → 4/7
REQ-video-ring-buffer NOT marked complete — still pending Plan 07
ffprobe D-12 gate per the requirement's traceability.
2026-05-15 17:54:04 +02:00
30e5efd364
docs(01-03): complete offscreen recorder TDD plan
...
- Add 01-03-SUMMARY.md documenting RED -> GREEN gate (Plan 02 tests now
pass), 3 Rule-3 auto-fixes (OffscreenLogger inline, defensive
bootstrap, SW dead-code removal), and Plan 04 / 05 handoff notes.
- Update STATE.md: advance plan counter to 4 of 7 (43%), append
metrics + 3 execution decisions, record session.
- Update ROADMAP.md: mark Plan 01-03 [x] complete.
REQ-video-ring-buffer remains NOT complete — still pending Plans 04
(port keepalive) and 07 (ffprobe acceptance gate).
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-15 17:42:21 +02:00
edc605d475
docs(01-02): complete wave-0 test infrastructure plan
...
- 01-02-SUMMARY.md created (Vitest 4.1.6 installed; 4 RED test files
pinning Plans 03+04 contracts; tests/fixtures/.gitkeep marker)
- STATE.md advanced: plan 2/7 -> 3/7; progress 14% -> 29%; metric row
added; 3 decisions logged; session continuity updated
- ROADMAP.md progress row updated: Phase 1 = 2/7 In Progress
- REQUIREMENTS.md: REVERTED premature [x] + "Complete" marking of
REQ-video-ring-buffer (Plan 01-01 mistakenly marked it; the requirement
is satisfied by Plans 03+04+07's implementation + ffprobe gate, not by
RED test scaffolding). Now reads "[ ]" + "In Progress" — honest state.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-15 17:28:49 +02:00
13b67f5136
docs(01-01): complete doc-cascade plan
...
Plan 01-01 (Wave-0 doc cascade) complete. Six tasks landed atomically
in commits 125c032 , fb88830 , b1ed2cb , 597d967 , 32bc996 , 4a5194e . Every
code-touching plan in Phase 1 (01-02..01-07) now reads a consistent
baseline: getDisplayMedia replaces tabCapture in DEC-003; long-lived
port replaces alarms in DEC-010; manifest.json carries the final
Phase-1 permissions set (desktopCapture, activeTab, downloads,
scripting, storage, offscreen).
SUMMARY: .planning/phases/01-stabilize-video-pipeline/01-01-SUMMARY.md
2026-05-15 17:19:48 +02:00
acb9033293
docs(01): record Phase 1 planning complete (7 plans, 7 waves)
...
After gsd-plan-phase 1: 7 plans across 7 waves. All gates pass:
- Plan-checker (sonnet) VERIFICATION PASSED on iteration 1
- Decision coverage gate (gsd-sdk): 19/19 decisions covered
- Requirements coverage: REQ-video-ring-buffer in all plans
- Security threat model: T-1-01/02/04 mitigated; T-1-03 accepted residual
Known non-blocking gaps:
- gsd-sdk roadmap.annotate-dependencies failed (t.trim is not a function);
ROADMAP plan-list annotations skipped. Phase 1 plan-list in ROADMAP.md
remains accurate; this is a cosmetic nice-to-have for cross-cutting
constraint visibility.
- 1 plan-checker warning (stale wave prose in Plan 03/04 objectives) was
fixed during decision-coverage revision.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-15 17:09:09 +02:00
4909f3155a
docs(state): record phase 1 context session .planning/STATE.md
2026-05-15 15:40:51 +02:00
89ca09ccec
docs: bootstrap .planning/ via /gsd-ingest-docs (2 docs) /home/parf/projects/work/repremium/.planning/PROJECT.md /home/parf/projects/work/repremium/.planning/REQUIREMENTS.md /home/parf/projects/work/repremium/.planning/ROADMAP.md /home/parf/projects/work/repremium/.planning/STATE.md /home/parf/projects/work/repremium/.planning/intel /home/parf/projects/work/repremium/.planning/INGEST-CONFLICTS.md /home/parf/projects/work/repremium/.ingest-manifest.yaml
2026-05-15 15:16:30 +02:00